EU procurement via the restricted procedure for the new construction of Sporthal Maasbree
EU restricted procurement for the new construction of Sporthal Maasbree (approx. 4,140 m2 GFA) by the Municipality of Peel en Maas. The contract will be awarded based on the best price-quality ratio of 70/30.
Works · Restricted · European procedure
01What is being requested
The new construction of a sports hall with approximately 4,140 m2 GFA in Maasbree, including the building and installation technology part. The assignment includes the realization of a building with sports functions, a catering facility, and space for Dynamic (Fitness).
This invitation to apply (hereinafter referred to as the Selection Guide) concerns the EU restricted procurement for the new construction of the sports hall in Maasbree for the benefit of the Municipality of Peel en Maas. The new construction of the sports hall must be realized by selecting and contracting a contractor who will realize the work. The contractor is fully responsible for both the building and the installation technology part of the assignment.
02Strategic insight
<ul Focus during the selection phase on maximizing the score by demonstrating timber construction (HSB wall, wooden trusses, CLT) and combined sports functions in the references. Ensure that the reference assignment meets the strict criteria: minimum € 6,000,000.00 in value and executed between 2020-2025. Note the strict deadline for application on June 29, 2026, at 12:00 PM.
03Points of attention
04Can I take part?
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
The contract will be awarded based on the best price-quality ratio (70/30).
07Process & timeline
08Value in context
09Likely competitors
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What is the scope of the contractor's responsibility?
How does the selection procedure for this assignment proceed?
What is the core of the assignment for the new construction of Sporthal Maasbree?
Automatically compiled from the official tender data and documents.
13Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159