EU procurement via the restricted procedure for the new construction of Kindcentrum Rennevoirt in Berkel-Enschot
This EU restricted procurement concerns the new construction of Kindcentrum Rennevoirt in Berkel-Enschot for an estimated value of € 12.1 million. The assignment includes the realization of a primary school, gymnasium, and childcare with a total area of approximately 3,890 m2 GFA.
Works · Restricted · European procedure
01What is being requested
New construction of a childcare center consisting of a primary school, gymnasium, and after-school care with a total of approx. 3,890 m2 GFA. The contractor is responsible for the technical design up to the detailed design and the realization of both building and installation works.
The new construction of Kindcentrum Rennevoirt will be realized directly adjacent to the existing Bs Rennevoirt and will replace the existing building. The school's nearly 500 pupils, 80 toddlers and preschoolers in childcare, and over 120 children in after-school care no longer fit in the existing school building, which no longer meets the needs of education and childcare in terms of both comfort and functionality. Stichting Mondiaen consists of an education and childcare organization which are jointly building Kindcentrum Rennevoirt.
02Outcome
Moeskops' Bouwbedrijf B.V.
03Strategic insight
Ensure a reference project that meets the specific requirements regarding sustainability and communication to achieve extra selection points. Ensure that the financial capacity of any third parties is fully demonstrated if they are deployed. Submit the application in a timely manner to prevent exclusion.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
The contract will be awarded on the basis of the best price-quality ratio.
08Process & timeline
09Value in context
10Bidders in this segment
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What is the purpose of the new construction of Kindcentrum Rennevoirt?
What is the nature of the works in this project?
Automatically compiled from the official tender data and documents.
14Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159