AwardedWorksEuropeanRestricted

EU procurement via the restricted procedure for the new construction of Kindcentrum Rennevoirt in Berkel-Enschot

Mondiaen · Restricted · 1 lots · 380549
Type
Works
45000000
Estimated value
€ 12M
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

This EU restricted procurement concerns the new construction of Kindcentrum Rennevoirt in Berkel-Enschot for an estimated value of € 12.1 million. The assignment includes the realization of a primary school, gymnasium, and childcare with a total area of approximately 3,890 m2 GFA.

Works · Restricted · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
€12,100,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

New construction of a childcare center consisting of a primary school, gymnasium, and after-school care with a total of approx. 3,890 m2 GFA. The contractor is responsible for the technical design up to the detailed design and the realization of both building and installation works.

The new construction of Kindcentrum Rennevoirt will be realized directly adjacent to the existing Bs Rennevoirt and will replace the existing building. The school's nearly 500 pupils, 80 toddlers and preschoolers in childcare, and over 120 children in after-school care no longer fit in the existing school building, which no longer meets the needs of education and childcare in terms of both comfort and functionality. Stichting Mondiaen consists of an education and childcare organization which are jointly building Kindcentrum Rennevoirt.

45000000€ 12MWorks
1Restricted contractor selection Rennevoirt€12,100,000

02Outcome

Awarded

Moeskops' Bouwbedrijf B.V.

Bidders
3

03Strategic insight

Strategic insight · AI analysis
Ensure a reference project that meets the specific requirements regarding sustainability and communication to achieve extra selection points. Ensure that the financial capacity of any third parties is fully demonstrated if they are deployed. Submit the application in a timely manner to prevent exclusion.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
The procurement follows a restricted procedure.Important
The European Single Procurement Document must be fully and legally signed.Important
Questions must be submitted via the TenderNed messaging module in the prescribed format.Important
In the case of a combination of parties, full joint and several liability is required.Important

05Can I take part?

Financial · 1
Sufficient financial and economic capacity; no known claims endangering continuity; auditor's report contains no continuity paragraph; appropriately insured against professional risks.Financial
Technical · 1
One relevant reference assignment of a childcare center (education, after-school care, and childcare) with a size of at least 2,300 m2 GFA and a value of at least € 7,200,000.00, carried out in the period 2019-2025.Technical
Other · 1
Possession of a VCA certificate as a company and a NEN-EN-ISO 9001:2015 certified quality system or equivalent.Other

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Award criteria

Best price-quality ratio30/70

The contract will be awarded on the basis of the best price-quality ratio.

08Process & timeline

Invitation to apply
27 mei 2025
Closing date questions selection phase
11 juni 2025
Note of instructions selection phase
16 juni 2025
Deadline for application
26 juni 2025 12.00 uur
Invitation to tender award phase
18 augustus 2025
Closing date questions 1st round award phase
28 augustus 2025
1st note of instructions award phase
1 september 2025
Closing date questions 2nd round award phase
15 september 2025
2nd note of instructions award phase
18 september 2025
Deadline for submission of tenders
29 september 2025 12.00 uur
Provisional award
6 oktober 2025
Final award
27 oktober 2025
Start bouw
november 2025
Oplevering
december 2027

09Value in context

€12,100,000

10Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9931×
2BINX Smartility B.V.SME9927×
3Kernbouw B.V.SME9511×
4Facilicom Solutions B.V.SME9114×
5Burgland Bouw BVSME8913×
6Jansman BouwUnknown8710×

11Tender documents

Nota van inlichtingen selectiefasepdfJun 16, 2025 · 174 KB
Bijlage 4 Uniform Europees AanbestedingsdocumentpdfMay 29, 2025 · 371 KB
Bijlage 2 AanmeldingsformulierdocxMay 29, 2025 · 41 KB
SelectieleidraadpdfMay 29, 2025 · 212 KB
Bijlage 1 Format vragendocxMay 29, 2025 · 27 KB
TN529402 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250527191857pdfMay 29, 2025 · 8 KB
Bijlage 3 CombinatieverklaringdocxMay 29, 2025 · 28 KB

12Legal themes that may be relevant here

13Frequently asked questions

What is the purpose of the new construction of Kindcentrum Rennevoirt?
The new construction is being realized directly next to the existing Bs Rennevoirt to replace the current building. This is necessary because the nearly 500 pupils, 80 toddlers and preschoolers, and over 120 children in after-school care no longer fit in the existing building in terms of comfort and functionality.
What is the nature of the works in this project?
The assignment concerns the realization of the new construction of Kindcentrum Rennevoirt, where the construction is carried out by the education and childcare organization that together form Stichting Mondiaen.

Automatically compiled from the official tender data and documents.

14Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 12 mln

Gegunde waarden in CPV 45 · werken n=3159