EU procurement according to the non-public procedure for a construction team for the renovation/new construction of KC De Kemp
EU non-public procurement for the renovation and new construction of Kindcentrum De Kemp by Stichting Prisma. The project includes the realization of approx. 2,019 m2 GFA by a construction team responsible for both building and installation technology work.
Works · Restricted · European procedure
01What is being requested
The assignment concerns the renovation/new construction of Kindcentrum De Kemp with a total of approx. 2,019 m2 GFA. The construction team is responsible for developing the final design into a technical design and the full realization of both the building and the installation technology parts.
The new construction of Kindcentrum de Kemp in Egchel must be realized by selecting and contracting a (combination of) contractor(s), who, within an engineering team, develop a final design into a technical design (TO) and are thereby also given the opportunity to realize the work. The (combination of) contractor(s) is fully responsible for both the building and the installation technology parts of the assignment.
02Strategic insight
<ul Ensure a very strong reference project that meets the specific requirements (child center, size, value, and period) to pass the selection phase. In the award phase, focus on the qualitative sub-criteria, as these carry the most weight with 60 points. Ensure that the substantiation of the open budget is watertight during the award phase to demonstrate the feasibility of the project.
03Points of attention
04Can I take part?
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
The sub-award criteria are: plan of approach for the construction team phase (phase 1)plan of approach realization phase (phase 2)guarantee of quality of the construction process, so that delivery can take place no later than December 2027substantiation of an open budget, which must be substantiated in such a way that it is clear that the building can be realized based on this budget For each part of the sub-award criteria, a maximum of 15 points can be earned.
Assessment of the price.
Assessment of the presentation.
07Process & timeline
08Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
09Likely competitors
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What is the specific scope of the assignment for the construction team?
What experience requirements are set for the bidding parties?
How is the cooperation structure of the assignment organized?
Automatically compiled from the official tender data and documents.
13Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159