ClosedWorksEuropean

EU procurement (Demolition and) New Construction Hart van Opwierde Cluster III (121 homes)

Type
Works
45211300
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Related EU procurement for the demolition and new construction of 121 homes (Cluster III, Hart van Opwierde) in Appingedam. Objective: development and construction agreement for one or two contractor(s) based on a demolition/new construction scenario for 119 homes, 65 at the expense of housing corporations, 56 private homes. Target period Q2-2025.

Works · European procedure

European
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Related EU procurement for the demolition and new construction of 121 homes (Cluster III, Hart van Opwierde) in Appingedam. Objective: development and construction agreement for one or two contractor(s) based on a demolition/new construction scenario for 119 homes, 65 at the expense of housing corporations, 56 private homes. Target period Q2-2025.

The Nationaal Coördinator Groningen (hereinafter: NCG) was established and instituted in May 2015 by the Ministerie van Binnenlandse Zaken en Koninkrijksrelaties. The task of NCG was to lead the realization of an earthquake-resistant and prosperous Groningen. N Since 1 January 2020, NCG has changed from a directing to an executing organization. From that moment on, NCG focuses entirely on the field of recording and assessing, engineering, building reinforcement, and making homes and other buildings in the Groningen gas field area sustainable. The earthquakes resulting from gas extraction in

45211300Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9269×
2Van Gelder BVSME9153×
3KWS Infra B.V.SME9092×
4Heijmans Infra B.V.SME8965×
5BAM Bouw en Techniek bvSME8934×
6Bouwgroep Dijkstra DraismaUnknown8811×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific scope of the assignment for Hart van Opwierde Cluster III?
The assignment includes the development and realization of 119 homes, following the demolition of the existing buildings. In total, the project concerns 121 homes, of which 65 are owned by housing corporations and 56 are in private ownership.
What type of agreement is concluded with the contractor(s)?
The Nationaal Coördinator Groningen (NCG) wishes to conclude a development and construction agreement with one or two contractor(s) for the execution of the project.
What specific design requirements are set for the new construction?
The new homes must be designed to be earthquake-resistant. Additionally, there is a requirement for nature-inclusive design and construction, arising from the conditions of the exemption from the Wet Natuurbescherming.
What is the intended period for the agreement to enter into force?
The aim is to have the development agreement(s) enter into force in Q2-2025.
Which activities are part of the development of the homes?
The activities include, among other things, collecting requirements from owners regarding the layout, designing earthquake-resistant homes involving owners in functionality and aesthetics, and coordinating the making of existing homes nature-free.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159