ClosedWorksEuropean

EU procurement public - Top layer renovation Athletics track AV Rijssen

Gemeente Rijssen-Holten · 1 lots · 356108
Type
Works
45236114
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Rijssen-Holten is issuing a European Public procurement for the top layer renovation of the synthetic 6-lane athletics track at Sportpark de Koerbelt, including the long jump, high jump, and javelin throw segments. The works also include asphalt and gutter elements. The maintenance period is 12 months after approval by the KNAU and final delivery. Execution must start after 1 July 2024, taking into account events in June, and must be fully playable and KNAU-inspected by 1 October 2024 (week 40) at the latest. Any imperfections must be repaired by 15 October 2024 at the latest. Working during the school holidays (bouwvak) is permitted without extra costs. The contractor must agree to the end date upon tendering. The procurement focuses on a specialist in sports facilities and asphalt work, with an emphasis on quality, timely delivery, and cooperation with AV Rijssen.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderathletics tracktop layer renovationsynthetic

01What is being requested

The Municipality of Rijssen-Holten is issuing a European Public procurement for the top layer renovation of the synthetic 6-lane athletics track at Sportpark de Koerbelt, including the long jump, high jump, and javelin throw segments. The works also include asphalt and gutter elements. The maintenance period is 12 months after approval by the KNAU and final delivery. Execution must start after 1 July 2024, taking into account events in June, and must be fully playable and KNAU-inspected by 1 October 2024 (week 40) at the latest. Any imperfections must be repaired by 15 October 2024 at the latest. Working during the school holidays (bouwvak) is permitted without extra costs. The contractor must agree to the end date upon tendering. The procurement focuses on a specialist in sports facilities and asphalt work, with an emphasis on quality, timely delivery, and cooperation with AV Rijssen.

Purpose of the procurement: The Municipality of Rijssen-Holten (hereinafter referred to as: Contracting Authority) as a contracting authority aims, with this European Public procurement, to award a contract to one Contractor for the top layer renovation of the existing synthetic athletics track at Sportpark de Koerbelt, located at Arend Baanstraat 107 in Rijssen, together with the athletics association AV Rijssen. A brief summary of the work: Renovation of a 6-lane athletics track including the segments for long jump, high jump, and javelin throw; Works relating to the asphalt and the gutter

45236114Works
1EU procurement public - Top layer renovation Athletics track AV Rijssen

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9273×
2KWS Infra B.V.SME9192×
3BAM Infra B.V.SME9177×
4D. van der Steen B.V.SME9131×
5Dura Vermeer Infra Regionale Projecten BVSME9058×
6Boskalis Nederland B.V.SME8969×

05Legal themes that may be relevant here

06Frequently asked questions

What exactly does the contract for the top layer renovation entail?
The contract concerns the renovation of a 6-lane synthetic athletics track, including the segments for long jump, high jump, and javelin throw. Additionally, the work includes activities on the asphalt and the gutters of the athletics track.
What is the schedule for the execution of the works?
Execution may not start earlier than 1 July 2024. The work must be delivered by 1 October 2024 (week 40) at the latest, being fully playable and KNAU-inspected. Any imperfections must be repaired by 15 October 2024 at the latest.
What rules apply to works during the school holidays (bouwvak)?
If the execution requires the contractor to continue working during the school holidays, it is not possible to settle extra costs for this.
What is the duration of the maintenance period after delivery?
The maintenance period is 12 months. This period commences after the approval by the KNAU and the final delivery of the works.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159