AwardedSuppliesEuropeanOpenGreen

EU Procurement Furniture for Primary Education of St. BOOR

Stichting BOOR · Open · 2 lots · 355378
Type
Supplies
39160000
Estimated value
€ 3,00M
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

This tender concerns the supply, assembly, and installation of furniture for primary education for Stichting BOOR.

Supplies · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Supplies
Open
Estimated value
€3,000,000
estimated value
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 39SuppliesEU tenderGreen / SPPschool furnitureoffice furnitureprimary education

01What is being requested

It concerns the supply, assembly, and installation of school furniture and office furniture for the primary education of Stichting BOOR.

It concerns the supply, assembly, and installation of school furniture and office furniture for primary education.

39160000€ 3,00MSupplies
1Lot Regular furniture
2Lot project furniture

02Outcome

Awarded

Heutink Primair Onderwijs B.V.

Bidders
5

03Breakdown by lot

Lot Regular furnituren/a
Lot project furnituren/a

Per-lot values not published — bars show only the lot breakdown.

04Strategic insight

Strategic insight · AI analysis
Ensure a complete bid by strictly following the checklist. Check whether all references align exactly with the requested competencies. Ensure that the prices include all costs for transport and assembly to prevent discrepancies.
Read automatically from the tender documents using AI. Always verify against the original documents.

05Points of attention

Important · 6
Changing the formats or texts in the Descriptive document will lead to exclusion.Important
An incomplete UEA or a non-legally signed UEA may lead to exclusion.Important
Bidders may not change the text other than where indicated.Important
Approaching other employees of Stichting BOOR may lead to exclusion.Important
Prices must be all-in, including transport, assembly, and removal.Important
The warranty period for parts must be guaranteed for at least 10 years after delivery.Important

06Can I take part?

Financial · 1
Possession of professional liability insurance.Financial
Technical · 1
Reference description of the requested core competencies, not older than three years.Technical
Other · 3
Extract from the Kamer van Koophandel, not older than six months.Other
Possession of a gedragsverklaring aanbesteden, not older than two years.Other
Statement from the belastingdienst regarding the payment of taxes and social security contributions.Other

07Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

08Value in context

€3,000,000

09Bidders in this segment

#Likely bidderFitWins
1Heutink Primair Onderwijs B.V.SME100149×
2Eromesmarko B.V.SME100105×
3Gispen Nederland BVSME10092×
4Presikhaaf Schoolmeubelen B.V.SME10051×
5Ahrend Nederland B.V.SME10058×
6B. Schilte en Zonen's Houthandel en Houtwarenfabriek B.V.SME10021×

10Tender documents

TN494156 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250312085245pdfMar 13, 2025 · 23 KB
Bijlage C - Prijzenblad NvIxlsxJan 7, 2025 · 32 KB
TN494156 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250106150442pdfJan 6, 2025 · 13 KB
32101_W01-01B - 1E VERDIEPING DEEL B_240906dwgDec 12, 2024 · 649 KB
32101_W01-02B - 2E VERDIEPING DEEL B_240906dwgDec 12, 2024 · 633 KB
32101_W01-00B - BEGANE GROND DEEL B_240906dwgDec 12, 2024 · 752 KB
32101_W01-00A - BEGANE GROND DEEL A_240906dwgDec 12, 2024 · 514 KB
32101_W01-02A - 2E VERDIEPING DEEL A_240906dwgDec 12, 2024 · 505 KB
32101_B01-01 - 1E VERDIEPING_220829 totaalpdfDec 11, 2024 · 833 KB
NvI - 3xlsxDec 11, 2024 · 17 KB
Planning NvI 2docxDec 9, 2024 · 21 KB
NvI - 2xlsxDec 2, 2024 · 359 KB

11Legal themes that may be relevant here

12Frequently asked questions

What does the assignment specifically entail for the supplier?
The assignment includes the supply, assembly, and installation of school furniture and office furniture for primary education. The supplier is responsible for the entire process from planning to final delivery.
What requirements must the delivery of goods meet?
The goods to be delivered must be delivered to a location specified by the contracting authority. If an order is delivered incorrectly or not on time, the contractor is obliged to arrange replacement within a reasonable period of less than 2 working weeks.
How are products that do not meet the specified requirements handled?
The contractor is obliged to exchange all delivered products that do not meet the specified requirements free of charge under identical conditions.
What requirements are placed on project management?
The contractor must appoint one fixed contact person for the contracting authority's contact person. This person acts as a point of contact and is responsible for the total project management and the final execution.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 196K
median
€ 480K
p75
€ 1,5 mln
€ 3,0 mln

Gegunde waarden in CPV 39 · leveringen n=792