EU Tender Loading, transporting and processing of Green Waste - Municipality of Hellendoorn and Rijssen-Holten
This public EU procurement by the municipalities of Hellendoorn and Rijssen-Holten concerns the conclusion of a framework agreement for the loading, transporting, and processing of approximately 6,900 tons of green waste per year. The contract is divided into two lots (Municipality of Hellendoorn and Municipality of Rijssen-Holten) and includes the collection of waste from waste collection points, municipal depots, and various locations, the transport to a processing facility, and the processing itself, possibly via Bokashi. The framework agreement has a duration of two years, with the possibility of unilateral extension for a maximum of two years. There is no exclusive supply guarantee, allowing the contractor to operate flexibly. The contracting authority reserves the right to select one contractor per lot, with a focus on quality, environmental friendliness, and cost-efficiency.
Services · Open · European procedure · SME-friendly
01What is being requested
This public EU procurement by the municipalities of Hellendoorn and Rijssen-Holten concerns the conclusion of a framework agreement for the loading, transporting, and processing of approximately 6,900 tons of green waste per year. The contract is divided into two lots (Municipality of Hellendoorn and Municipality of Rijssen-Holten) and includes the collection of waste from waste collection points, municipal depots, and various locations, the transport to a processing facility, and the processing itself, possibly via Bokashi. The framework agreement has a duration of two years, with the possibility of unilateral extension for a maximum of two years. There is no exclusive supply guarantee, allowing the contractor to operate flexibly. The contracting authority reserves the right to select one contractor per lot, with a focus on quality, environmental friendliness, and cost-efficiency.
The objective of this public EU procurement is to conclude a Framework Agreement with one contractor per lot for the loading and transport of Green Waste from waste collection points, municipal depots, and several locations within the Municipality of Hellendoorn & Rijssen-Holten. The assignment also includes the (commissioned) processing of the green waste to be removed. The total estimated volume for both municipalities is approximately 6,900 tons per year. The duration of the Framework Agreement is two (2) years, with a unilateral option for the contracting authority to extend this agreement
02Outcome
RETERRA B.V.
03Breakdown by lot
04Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
05Value in context
06Bidders in this segment
07Tender documents
08Legal themes that may be relevant here
09Frequently asked questions
What is the scope of the contract regarding the volume of green waste?
What is the duration of the framework agreement and what extension options are available?
What does the contract entail regarding the processing of the waste?
Is there an exclusive supply guarantee for the green and leaf waste?
Automatically compiled from the official tender data and documents.
10Estimated value versus the market
€ 214K
€ 466K
€ 1,2 mln
Gegunde waarden in CPV 90 · diensten n=2216