OpenSuppliesEuropeanSME-friendlyOpen

DWZ Wranghe - Pumps

Evides N.V. · Open · 4 lots · 416839
Type
Supplies
42122000 · Pumps
Estimated value
Not published
To deadline
-44d
May 4, 2026 · 12:00
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Promising — consider biddingconfidence high

Evides N.V. wishes to tender the supply of pumps for the DWZ Wranghe project, divided into four specific lots via an open European procedure.

Supplies · Open · European procedure · SME-friendly

SME-friendlyEuropean1 exclusion groundsComplete timeline
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
May 4, 2026
12:00
Scope
European
European procedure
Lots
4
4 lots
Main CPV code
Pumps
Location
Netherlands
CharacteristicsCPV 42SuppliesSME-friendlyEU tenderDrinking waterPumpsEvides

01What is being requested

The supply includes the delivery of pumps in accordance with the tender documents for the project DWZ Wranghe. The assignment is divided into four lots: High pressure pumps, NF pumps, Pre- and post-treatment pumps, and Submersible pumps.

Supply of pumps for a new drinking water treatment plant to be constructed.

42122000Supplies
1Lot 1 - High pressure pumps€1
2Lot 2 - NF pumps
3Lot 3 - Pre- and post-treatment pumps€1
4Lot 4 - Submersible pumps€1

02Breakdown by lot

Lot 1 - High pressure pumps€1
Lot 2 - NF pumps
Lot 3 - Pre- and post-treatment pumps€1
Lot 4 - Submersible pumps€1

03Strategic insight

Strategic insight · AI analysis
Ensure full substantiation of equivalence if you deviate from the mentioned brands or specifications. Pay strict attention to the technical description of work and datasheets, as these also include sustainability criteria. Verify that all documents have been signed by a legally authorized official.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 6
Bids must be submitted unconditionally and without any reservation.Important
All documents must be submitted as a PDF file.Important
References to brands or standards must be read with the addition 'or equivalent'.Important
The burden of proof for equivalence lies with the Bidder.Important
Bidders may not approach officials of the Contracting Authority, directly or indirectly.Important
An EU sanctions package Russia applies, whereby Russian parties (or parties with >10% Russian participation) are excluded.Important

05Can I take part?

Exclusion ground · 1
No grounds for exclusion applicable.Exclusion ground
Financial · 2
GEFE1 Adequately insuredFinancial
GEFE2 ContinuityFinancial
Technical · 3
GETB1 Reference per core competencyTechnical
GETB2 Requirements regarding quality assuranceTechnical
GETB3 Employee certificationTechnical

06Exclusion grounds

Exclusion grounds (1)
  • No grounds for exclusion applicable.

07Award criteria

Financial award criterionweight n/a

Assessment of the financial aspect of the bid.

08Process & timeline

Tender publication
2026-03-20
Closing date for submitting questions
2026-04-03, vóór 12:00 uur
Publication of Memorandum of Information
2026-04-17
Closing date for submitting bids
2026-05-04, vóór 12:00 uur
Verification of bids
2026-05-19
Communication of award decision
2026-05-21
Final award decision
2026-06-15
Expected commencement date of agreement
2026-06-16

09Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

10Likely competitors

#Likely bidderFitWins
1Sulzer Pumps Wastewater Netherlands B.V.SME10063×
2Heijmans Infra B.V.SME9346×
3Den Ouden Aannemingsbedrijf B.V.SME8716×
4Maas International B.V.SME8624×
5De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME8526×
6Xylem Water Solutions Nederland B.V.SME84

11Tender documents

Geschiktheidseisen.pdfpdfApr 3, 2026 · 47 KB
Aanbestedingsfase.pdfpdfApr 3, 2026 · 22 KB
UEA Evides N.V..pdfpdfApr 3, 2026 · 88 KB
Algemeen.pdfpdfApr 3, 2026 · 41 KB
Conceptovereenkomst Wranghe Pompen - publicatie versie.pdfpdfApr 3, 2026 · 589 KB
Aanbestedingsleidraad Pompen Definitief.pdfpdfApr 3, 2026 · 855 KB
AIV Diensten en leveringen 2024.pdfpdfApr 3, 2026 · 537 KB
ARN 2016.pdfpdfApr 3, 2026 · 175 KB
Welkom, Aanbestedingsleidraad en instructie.pdfpdfApr 3, 2026 · 30 KB
Uitsluitingsgronden.pdfpdfApr 3, 2026 · 40 KB
Minimumeisen.pdfpdfApr 3, 2026 · 28 KB
Voorwaarden.pdfpdfApr 3, 2026 · 37 KB

12Legal themes that may be relevant here

13Frequently asked questions

What is the specific assignment for this tender?
The assignment concerns the supply of pumps for a new drinking water treatment plant (DWZ Wranghe) to be constructed.
Which suitability criteria must bidders meet?
Bidders must possess proven experience with similar pump systems in drinking water treatment and must submit a full, detailed quotation including a delivery schedule.
What types of pumps are supplied within the different lots?
The supply includes high pressure pumps, NF pumps, pumps for pre- and post-treatment, and submersible pumps.

Automatically compiled from the official tender data and documents.

14Estimated value versus the market

p25
€ 300K
median
€ 800K
p75
€ 4,0 mln
deze opdracht

Gegunde waarden in CPV 42 · leveringen n=273