AwardedSuppliesEuropeanOpen
Sustainable Electricity and Gas
Centraal Orgaan opvang asielzoekers (COA) · Open · 1 lots · 336811
6
6 of 6 core insights found
Measures presence, not accuracy · documents remain authoritative
ScopeAdvicePoints of attentionSuitability requirementsAward criteriaTimeline
Type
Supplies
09310000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high
Supply of sustainable electricity and gas to the locations of the COA with a maximum duration of 72 months.
Supplies · Open · European procedure
European
CharacteristicsCPV 09SuppliesEU tender
01What is being requested
The contract concerns the supply of sustainable electricity and, from 2027, also gas to the locations of the COA. The duration is a maximum of 72 months including extension options.
See the descriptive document
1Entire contract—
02Outcome
Awarded
Eneco Zakelijk B.V.
Bidders
1
03Strategic insight
Strategic insight · AI analysis
Ensure a nationwide supply to meet the requirements. Take into account the flexibility required for fluctuating volumes. Pay specific attention to the contractual terms regarding the revision of storage.
04Points of attention
Important · 5
The contract is a combination of electricity and gas.Important
The COA is an expanding and contracting organization.Important
There is a revision clause for the maximum contract value.Important
The contracting authority may revise storage after the initial term.Important
There is an authority to adjust the gas volume.Important
05Can I take part?
Professional capability · 1
Suitability requirements regarding professional competence.Professional capability
Financial · 1
Suitability requirement regarding the financial and economic standing of the Bidder.Financial
Technical · 1
Suitability requirements regarding the technical ability and professional competence of the Bidder.Technical
Other · 2
Suitability requirement 4.Other
Suitability requirement 5.Other
06Exclusion grounds
Exclusion grounds — consult the ESPD
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
Sub-award criteria qualityweight n/a
Assessment based on the stated sub-award criteria for quality.
Sub-award criterion priceweight n/a
Assessment based on the sub-award criterion for price.
08Value in context
Estimate not published
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
09Bidders in this segment
#Likely bidderFitWins
1De Groene Stroomfabriek N.V.SME10019×
2Eneco Zakelijk B.V.SME9921×
3VanHelderUnknown9513×
4N.V. Vattenfall Sales NederlandSME9216×
5Gazprom Marketing & Trading Retail LimitedUnknown9016×
6Twee30 B.V.SME897×
10Tender documents
TN467303 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20241028084739pdfOct 29, 2024 · 8 KB
TN467303 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240719123839pdfJul 19, 2024 · 10 KB
Mededeling uitstel planningpdfJul 19, 2024 · 111 KB
Addendum perceelindelingpdfJul 2, 2024 · 158 KB
Gewijzigd Nav NvI 2 - Bijlage N - Gas AansluitingenxlsxJun 19, 2024 · 44 KB
Nota van Inlichtingen 2pdfJun 19, 2024 · 184 KB
Gewijzigd Nav Nvi 2 - Bijlage L - Elektriciteit AansluitingenxlsxJun 19, 2024 · 45 KB
Gewijzigd nav NvI 2 - Bijlage D - PrijzenbladxlsxJun 19, 2024 · 21 KB
Gewijzigd Nav NvI 2 - Bijlage C - Concept Leveringsovereenkomst duurzame elektriciteit en gasdocJun 19, 2024 · 230 KB
Gewijzigd nav NvI 2 - Beschrijvend document openbare aanbesteding Duurzame Elektriciteit en GaspdfJun 19, 2024 · 688 KB
Nota van Inlichtingen 1pdfJun 6, 2024 · 108 KB
Gewijzigd Nav NvI 1 - Bijlage E - Algemene Voorwaarden voor de Levering van Elektriciteit en Gas COApdfJun 6, 2024 · 221 KB
11Legal themes that may be relevant here
Advies 48> Europese niet-openbare procedure voor werktuigkundige en elektrotechnische installaties van de nieuwbouw van een multifunctionelAdvies 59> Meervoudig onderhandse aanbestedingsprocedure met betrekking tot een opdracht voor de levering van postdiensten en bezorging. InAdvies 98> Europese openbare aanbestedingsprocedure voor een raamovereenkomst met één ondernemer voor het vervangen van armaturen (straatveAdvies 53> Europese openbare procedure voor een overheidsopdracht tot het verrichten van diensten bestaande uit (dagelijks en periodiek) scAdvies 451> Beklaagden hebben op 29 mei 2017 een Europese openbare aanbestedingsprocedure aangekondigd voor een raamovereenkomst per perceel
12Frequently asked questions
What is the content of the contract?
The contract concerns the supply of sustainable electricity and gas.
Which subjects fall within the energy supply?
The contract distinguishes between the supply of physical energy and the supply of Guarantees of Origin (GOs).
In what way is the contract divided?
The contracting authority uses a perspective where the distinction between electricity and gas serves as the starting point for the classification.
Automatically compiled from the official tender data and documents.
13Estimated value versus the market
p25
€ 300K
€ 300K
median
€ 691K
€ 691K
p75
€ 2,0 mln
€ 2,0 mln
deze opdracht
Gegunde waarden in CPV 09 · leveringen n=226