ClosedWorksEuropeanRestrictedGreen

Sustainable through Waalre: Traverse Noord and Heikantstraat

Gemeente Waalre · Restricted · 1 lots · 355496
Type
Works
45233000
Estimated value
€ 6,15M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Waalre is tendering a combined redevelopment of the Traverse Noord and Heikantstraat. The project includes the removal and replacement of vegetation, asphalt, foundations, sewerage and the installation of new sewerage, underground water storage, gullies, foundations, paving, asphalt, signage, marking and street furniture. The works are located at two sites within the municipal boundaries, but are executed as a single contract to minimize traffic disruption. The project is divided into two main phases: Traverse Noord (Bergstraat to Paradijslaan including wadi) and Heikantstraat (outside the built-up area to Valkenswaard). Execution starts in January 2025, with a final completion date for Traverse Noord on December 31, 2025, due to subsidy conditions. The total duration is approximately one and a half years. The contract is intended for an average civil engineering company, without division into lots, and requires an integrated approach for all works.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€6,151,530
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPTraverse NoordHeikantstraatWaalre

01What is being requested

The Municipality of Waalre is tendering a combined redevelopment of the Traverse Noord and Heikantstraat. The project includes the removal and replacement of vegetation, asphalt, foundations, sewerage and the installation of new sewerage, underground water storage, gullies, foundations, paving, asphalt, signage, marking and street furniture. The works are located at two sites within the municipal boundaries, but are executed as a single contract to minimize traffic disruption. The project is divided into two main phases: Traverse Noord (Bergstraat to Paradijslaan including wadi) and Heikantstraat (outside the built-up area to Valkenswaard). Execution starts in January 2025, with a final completion date for Traverse Noord on December 31, 2025, due to subsidy conditions. The total duration is approximately one and a half years. The contract is intended for an average civil engineering company, without division into lots, and requires an integrated approach for all works.

The agreement consists of the redevelopment of the Traverse Noord and the Heikantstraat. The work mainly consists of: - removal of vegetation - removal of asphalt surfacing - removal of element paving - removal of foundations - excavation, transport and processing of soil - removal of existing sewerage - installation of sewerage - installation of underground water storage - installation of gullies - installation of foundations - installation of edge restraints - installation of paving - installation of asphalt surfacing - installation of signage and marking - installation of street furniture

45233000€ 6,15MWorks
1Sustainable through Waalre: Traverse Noord and Heikantstraat€6,151,530

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€6,151,530

04Likely competitors

#Likely bidderFitWins
1Van Gelder BVSME9753×
2Dura Vermeer Infra Regionale Projecten BVSME9758×
3Den Ouden Aannemingsbedrijf B.V.SME9723×
4KWS Infra B.V.SME9692×
5Boskalis Nederland B.V.SME9669×
6BAM Infra B.V.SME9577×

05Legal themes that may be relevant here

06Frequently asked questions

What is the intended start date and the expected total duration of the works?
The execution of the works starts in January 2025. The total expected execution duration is approximately one and a half years.
What specific deadline applies to the completion of the Traverse Noord?
For the redevelopment of the Traverse Noord, a final completion date of December 31, 2025, applies due to applicable subsidy conditions.
Why was one combined contract chosen instead of two separate procedures?
The contracts for the Traverse Noord and the Heikantstraat have been merged to compress the traffic disruption for residents and traffic on the north-south traffic axis to the shortest possible period.
Into which two main phases is the project divided?
The project consists of two phases: Traverse Noord (from Bergstraat to Paradijslaan including wadi) and the Heikantstraat (outside the built-up area to Valkenswaard).
What are the most important works included in this contract?
The works include, among other things, the removal and installation of sewerage, foundations, asphalt surfacing and paving, the construction of underground water storage, gullies, signage, marking and street furniture.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 6,2 mln

Gegunde waarden in CPV 45 · werken n=3159