ClosedWorksRestricted

Oudekerk Village Centre

Stichting Waternet · Restricted · 1 lots · 323026
Type
Works
45000000
Estimated value
€ 3,35M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Waternet has issued a non-public tender for works in the village centre of Ouderkerk aan de Amstel. The dike in question, which separates the Amstel and the Duivendrechtse polder, was rejected in 2012 due to insufficient height. The streets Hoger Einde-Zuid and part of the Dorpsstraat form a residential and commercial centre, as a result of which the dike is no longer recognised as a flood defence. The assignment focuses on the redesign and raising of the dike to ensure water safety, including adjusting the infrastructure, obtaining the necessary permits, and minimising disruptions for the local community. The works must comply with national water safety standards, taking into account climate change and future water levels. The tender requires a detailed technical design, a feasibility study, a safety plan, and a realistic schedule. The contracting authority expects a sustainable solution that maintains the liveability of the centre and strengthens the flood defence.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
€3,350,000
estimated value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksdikeflood defenceOuderkerk

01What is being requested

Stichting Waternet has issued a non-public tender for works in the village centre of Ouderkerk aan de Amstel. The dike in question, which separates the Amstel and the Duivendrechtse polder, was rejected in 2012 due to insufficient height. The streets Hoger Einde-Zuid and part of the Dorpsstraat form a residential and commercial centre, as a result of which the dike is no longer recognised as a flood defence. The assignment focuses on the redesign and raising of the dike to ensure water safety, including adjusting the infrastructure, obtaining the necessary permits, and minimising disruptions for the local community. The works must comply with national water safety standards, taking into account climate change and future water levels. The tender requires a detailed technical design, a feasibility study, a safety plan, and a realistic schedule. The contracting authority expects a sustainable solution that maintains the liveability of the centre and strengthens the flood defence.

In the village centre of Ouderkerk aan de Amstel, there is a secondary flood defence managed by Waterschap Amstel, Gooi en Vecht. Due to the layout of the surrounding area as a residential hub (a centre for business and shops), the streets Hoger Einde-Zuid and partially the Dorpsstraat are not recognisable as a dike. The dike has always served as a flood defence between the Amstel and the Duivendrechtse polder. In 2012, the dike was rejected because it is not high enough.

45000000€ 3,35MWorks
1Oudekerk Village Centre €3,350,000

02Value in context

€3,350,000

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2Van Gelder BVSME9853×
3BAM Infra B.V.SME9777×
4Heijmans Infra B.V.SME9665×
5Dura Vermeer Infra Regionale Projecten BVSME9658×
6Boskalis Nederland B.V.SME9669×

04Legal themes that may be relevant here

05Frequently asked questions

What is the specific reason for this assignment in Ouderkerk aan de Amstel?
The secondary flood defence between the Amstel and the Duivendrechtse polder was rejected in 2012 because the dike has insufficient height to serve as a flood defence.
What is the nature of the works for the flood defence in the village centre?
The assignment concerns the redesign and raising of the dike to ensure water safety, whereby the dike functions as a separation between the Amstel and the Duivendrechtse polder.
What impact does the location have on the execution of the works?
The dike is located in a residential hub where the streets Hoger Einde-Zuid and part of the Dorpsstraat serve as a centre for business and shops.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,4 mln

Gegunde waarden in CPV 45 · werken n=3159