AwardedWorksEuropeanOpen

Almere-Lelystad Through-Cycling Route

Gemeente Lelystad · Open · 1 lots · 371055
Type
Works
45233162
Estimated value
€ 4,86M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns the realization of the through-cycling route between Almere and Lelystad by means of various civil engineering works. The execution is divided into four specific routes with various deadlines in 2025 and 2026.

Works · Open · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Works
Open
Estimated value
€4,863,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Realization of the Almere-Lelystad Through-Cycling Route consisting of four routes. The assignment includes, among other things, earthworks, the application of various pavings, grounds maintenance, and the installation of public lighting.

It concerns a through-cycling route of min. 4.00 meters wide that is equipped with lighting. The entire through-cycling route starts at the Buitenring at the connection Gerard Monninckpad/ Kotterbosweg (Almere) and ends at the level of the connection to the Knardijk. The length concerns approx. 10.1 kilometers. The through-cycling route is realized in a settlement-sensitive area, where limited workspace is available. The Contracting Authority sees challenges for the Contractor in creating sufficient storage possibilities for material and equipment and organizing the construction logistics, giv

45233162Works
1Almere-Lelystad Through-Cycling Route

02Outcome

Awarded

Fa. Gebr. Van der Lee

Award value
€4,863,000
Bidders
5

03Strategic insight

Strategic insight · AI analysis
Ensure precise coordination with Staatsbosbeheer for the layout of depots. Take into account strict ecological restrictions and working hours to prevent delays. A good Better Performance score is essential for future assignments.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 6
The contractor must provide and organize the depot space themselves.Important
For works along waterways, a framework permit is required via a notification.Important
At the unloading quay, account must be taken of shipping on the Lage Vaart.Important
An ecological work protocol must be drawn up and approved prior to execution.Important
Works during the breeding season are dependent on the presence of birds.Important
The contracting authority assesses the contractor via Better Performance via QFact.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Process & timeline

Commencement of work
Augustus 2025
Earth and paving works within core zone Knardijk completed
15 oktober 2025
Commencement of works between KM 136.650 and 14.100
Na 1 november 2025
Works earth raising route 5 start
medio september 2025
Final delivery Kotterbosweg, Kotterbospad and Praamweg
1 mei 2026
Final delivery Zuiderhagen
1 augustus 2026

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Bidders in this segment

#Likely bidderFitWins
1Fa. Gebr. Van der LeeUnknown9823×
2KWS Infra B.V.SME9692×
3Heijmans Infra B.V.SME9465×
4BAM Infra B.V.SME9377×
5Van Gelder BVSME9353×
6Dura Vermeer Infra Regionale Projecten BVSME9358×

09Tender documents

TN515539 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250804133240pdfAug 5, 2025 · 11 KB
TN515539 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250617142319pdfJun 17, 2025 · 11 KB
TN515539 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250612154514pdfJun 12, 2025 · 11 KB
Bestek BK12712_DFR_Almere-Lelystad_WerkbestekrsxJun 12, 2025 · 2716 KB
Nota van inlichtingen 2025-06-12-1pdfJun 12, 2025 · 129 KB
Bestek BK12712_DFR_Almere-Lelystad_NvI_02nsxJun 12, 2025 · 121 KB
2e nota van inlichtingen doorfietsroute Almere - Lelystad (2e herziende versie 12-6-2025)pdfJun 12, 2025 · 267 KB
Bestek BK12712_DFR_Almere-Lelystad_WerkbestekpdfJun 12, 2025 · 718 KB
Nota van inlichtingen 2025-06-06-1pdfJun 6, 2025 · 128 KB
BK1272-RHD-BO-T3-DR-N-2233pdfJun 4, 2025 · 7270 KB
Nota van inlichtingen 2025-06-04-1pdfJun 4, 2025 · 2 KB
22133 Bijlage 8 - MKI-score invl nvi1xlsxJun 4, 2025 · 23 KB

10Legal themes that may be relevant here

11Frequently asked questions

What are the technical specifications of the through-cycling route to be realized?
The through-cycling route has a length of approximately 10.1 kilometers and a minimum width of 4.00 meters. The route will be provided with public lighting.
What logistical challenges are there during the execution of the works?
The realization takes place in a settlement-sensitive area with limited workspace. This places requirements on the organization of the construction logistics and the creation of sufficient storage possibilities for material and equipment.
May a framework agreement be used to meet the technical suitability requirement for concrete cycle paths?
Yes, a framework agreement in which multiple cycle paths have been constructed may be used, provided that the other frameworks remain in force, such as the type of paving and the execution within the past 5 years.
Which works are among others carried out at the Kotterbosweg?
The works include, among other things, preparatory works such as mowing and clearing works, earthworks, foundations, asphalt paving, element paving, concrete paving, and the installation of street furniture.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159