AwardedWorksEuropeanCompetitive dialogueGreen

Dike reinforcement Thorn/Wessem HWBP-WL

Waterschap Limburg · Competitive dialogue · 1 lots · 338721
Type
Works
45240000
Estimated value
€ 60M
awarded
To deadline
Ongoing
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

This tender concerns a two-phase light contract for the dike reinforcement and stream restoration in Thorn-Wessem by Waterschap Limburg. The assignment includes both the plan development phase and the realization phase.

Works · Competitive dialogue · European procedure

Sustainability countsEuropean1 exclusion grounds
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
€60,237,400
awarded value
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

The assignment concerns the execution of the dike reinforcement and stream restoration near Thorn-Wessem. This includes the Final Design, the Detailed Design, conditioning investigations, the SKK estimate, and the realization of the works during an expected duration of 4.5 years.

The realization of a dike reinforcement and stream restoration task in Thorn/Wessem using a two-phase approach light.

45240000Works
1The realization of a dike reinforcement and stream restoration task in Thorn/Wessem using a two-phase approach light.

02Outcome

Awarded

Heijmans Infra B.V.

Award value
€60,237,400
Bidders
3

03Strategic insight

Strategic insight · AI analysis
During the dialogue, focus on the manufacturability and technical risks of the design. Use expert judgement to test the feasibility of the materialization. Ensure strong control of the earth balance in the design.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
The technical elaboration of the hard barrier near Wessem is a challenge.Important
Optimization of the earth balance in relation to the stream is necessary.Important
A heavy best-efforts obligation applies to remain within the total realization budget.Important
The contractor is responsible for applying for permits, with the exception of the main permits.Important

05Can I take part?

Technical — Technical competence.
Exclusion ground — Exclusion grounds.

06Exclusion grounds

Exclusion grounds (1)
  • Exclusion grounds.

07Award criteria

Qualityweight n/a

Assessment of the quality.

Priceweight n/a

Assessment of the price.

Plan of approachweight n/a

Fulfillment of the award criterion plan of approach.

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Bidders in this segment

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown10073×
2Ploegam B.V.SME9722×
3Boskalis Nederland B.V.SME9670×
4Van Oord Nederland BVSME9619×
5Dura Vermeer Infra Regionale Projecten BVSME9558×
6Heijmans Infra B.V.SME9565×

10Tender documents

TN470246 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250324104929pdfMar 25, 2025 · 9 KB
Nota van inlichtingen 2024-06-26-1pdfJun 26, 2024 · 8 KB
Presentatie Thorn Wessem startbijeenkomst aanbestedingpdfJun 18, 2024 · 3138 KB
Bijlage 1 Inleiding op de overeenkomstpdfJun 7, 2024 · 547 KB
uea_470246_20240603164011pdfJun 7, 2024 · 1611 KB
Bijlage 4 Verslag marktconsultatie Thorn WessempdfJun 7, 2024 · 751 KB
Bijlagen A-F selectieleidraaddocxJun 7, 2024 · 95 KB
Bijlage 4 Verslag marktconsultatie bijlage 2 NvIpdfJun 7, 2024 · 90 KB
Aanbestedingsleidraad versie selectie Thorn-WessempdfJun 7, 2024 · 1759 KB
TN470246 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240606120035pdfJun 7, 2024 · 10 KB
Bijlage 2 Vraagspecificatie Algemeen (VSA)pdfJun 7, 2024 · 2245 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the specific scope of the works for the dike reinforcement?
The assignment includes approximately 4.3 km of landside regular dike reinforcement (green dike) and approximately 0.9 km of fixed hard barrier at the Maasboulevard.
In what manner will the assignment be executed?
The realization of the dike reinforcement and the stream restoration task in Thorn/Wessem takes place via a two-phase approach light.
Which themes are included in the tender criteria?
In addition to the technical execution of the works, sustainability and corporate social responsibility are part of the assessment.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 60 mln

Gegunde waarden in CPV 45 · werken n=3159