Dijkversterking SAFE (Streefkerk-Ameide-Fort Everdingen)

Waterschap Rivierenland · Competitive dialogue · 1 lots · 324295
Type
Works
45240000
Estimated value
€ 115M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Rivierenland (WSRL) is launching an EU open procedure for the dike reinforcement of the Lekdijk (SAFE) in Zuid-Holland and Utrecht. The project concerns a partial reinforcement of more than 12 km of Lekdijk involving multiple failure mechanisms, as part of the Hoogwaterbeschermingsprogramma. WSRL is seeking a design and construction team that, after meeting the stated requirements, will undertake the entire project phase (design to completion). The emphasis lies on sustainable, efficient execution with intensive collaboration to minimize risks, particularly financial risks. The procedure is a competitive dialogue, starting on 30 January 2024, with a kick-off meeting on 7 February 2024.

Works · Competitive dialogue · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
€115,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPdijkversterkingLekdijkHoogwaterbeschermingsprogramma

01What is being requested

Waterschap Rivierenland (WSRL) is launching an EU open procedure for the dike reinforcement of the Lekdijk (SAFE) in Zuid-Holland and Utrecht. The project concerns a partial reinforcement of more than 12 km of Lekdijk involving multiple failure mechanisms, as part of the Hoogwaterbeschermingsprogramma. WSRL is seeking a design and construction team that, after meeting the stated requirements, will undertake the entire project phase (design to completion). The emphasis lies on sustainable, efficient execution with intensive collaboration to minimize risks, particularly financial risks. The procedure is a competitive dialogue, starting on 30 January 2024, with a kick-off meeting on 7 February 2024.

Waterschap Rivierenland (WSRL) announces the tender for the project 'dijkversterking Streefkerk-Ameide-Fort Everdingen (SAFE)'. The SAFE dike reinforcement project is part of the Hoogwaterbeschermingsprogramma. The task concerns a dike improvement of the Lekdijk with a length of over 12 km involving multiple failure mechanisms; it concerns a partial dike reinforcement.   歓迎n The SAFE project is located on the south side of the river Lek in the provinces of Zuid-Holland and Utrecht and within the municipalities of Molenlanden and Vijfheerenlanden. The objective of this Tender is to select a d

45240000€ 115MWorks
1Dijkversterking SAFE (Streefkerk-Ameide-Fort Everdingen)€115,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€115,000,000

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Arcadis Nederland B.V.SME100116×
3Dura Vermeer Infra Regionale Projecten BVSME10058×
4Heijmans Infra B.V.SME10067×
5ENGIE Infra & Mobility B.V.SME10069×
6Ploegam B.V.SME10022×

05Legal themes that may be relevant here

06Frequently asked questions

Wat is de specifieke inhoud van het project Dijkversterking SAFE?
The project concerns a partial dike reinforcement of the Lekdijk over a length of more than 12 km, addressing multiple failure mechanisms as part of the Hoogwaterbeschermingsprogramma.
Welke expertise wordt gezocht van de ontwerpteampartner?
The contracting authority is seeking a design team partner with both design and execution expertise for the design team phase, who, after meeting the stated requirements, will also undertake the full execution of the project.
Wat is het doel van de samenwerkingsvorm bij dit project?
Intensive collaboration will take place with the contractor to ensure the realization of the project proceeds in a sustainable and efficient manner and to minimize risks during execution, particularly financial risks.
Op welke locaties vindt de dijkversterking plaats?
The dike reinforcement takes place on the south side of the river Lek, within the provinces of Zuid-Holland and Utrecht and within the municipalities of Molenlanden and Vijfheerenlanden.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 115 mln

Gegunde waarden in CPV 45 · werken n=3159