ClosedWorksMarktconsultatie

Dewatering and drying of Porthos high pressure pipeline

Porthos Development C.V. · Marktconsultatie · 1 lots · 224472
Type
Works
45232000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Porthos Development C.V. is seeking a specialist to develop a dewatering and drying strategy for the high-pressure section of the Porthos pipeline system, which runs from the land-based compressor station to the offshore Taqa P18-A platform. The assignment includes the design, documentation, and implementation of a safe, efficient, and environmentally friendly approach for removing water and drying pipelines, including the necessary installations, tests, and commissioning. The contractor must comply with all relevant safety and environmental legislation, provide a detailed project plan, and realize the strategy in collaboration with Porthos and external partners. The focus is on technical innovation, cost control, and timely delivery, with an emphasis on the unique offshore conditions and high-pressure requirements.

Works · Marktconsultatie · National procedure

Contracting authority
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksdewateringdryinghigh-pressure pipeline

01What is being requested

Porthos Development C.V. is seeking a specialist to develop a dewatering and drying strategy for the high-pressure section of the Porthos pipeline system, which runs from the land-based compressor station to the offshore Taqa P18-A platform. The assignment includes the design, documentation, and implementation of a safe, efficient, and environmentally friendly approach for removing water and drying pipelines, including the necessary installations, tests, and commissioning. The contractor must comply with all relevant safety and environmental legislation, provide a detailed project plan, and realize the strategy in collaboration with Porthos and external partners. The focus is on technical innovation, cost control, and timely delivery, with an emphasis on the unique offshore conditions and high-pressure requirements.

Porthos is developing the de-watering and drying strategy for the high-pressure portion of the Porthos pipeline system which runs from the shore-based compressor station to the offshore Taqa P18-A platform.

45232000Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9369×
2Heijmans Infra B.V.SME9365×
3Dura Vermeer Infra Regionale Projecten BVSME9258×
4Fa. Gebr. Van der LeeUnknown9123×
5SPIE Nederland B.V.SME8623×
6G. van der Ven BV AannemingsbedrijfSME8615×

04Legal themes that may be relevant here

05Frequently asked questions

What is the specific scope of this assignment?
The assignment concerns the development of a strategy for the dewatering and drying of the high-pressure section of the Porthos pipeline system, which runs from the land-based compressor station to the offshore Taqa P18-A platform.
What are the main technical focus points for the execution?
The focus is on technical innovation, cost control, and timely delivery, specifically taking into account the unique offshore conditions and the high-pressure requirements.

Automatically compiled from the official tender data and documents.