ClosedWorksEuropeanCompetitive procedure with negotiationGreen

Design, construction and installation of a CO2 liquefaction and storage plant

N.V. HVC · Competitive procedure with negotiation · 314106
Type
Works
45252000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the design, construction and installation of a CO2 liquefaction and storage plant at N.V. HVC in Alkmaar. The project focuses on the development of a fully integrated system capable of liquefying CO2 from industrial processes, storing it, and potentially returning it to the chain. The contracting authority expects a technically sound design, a construction plan meeting quality and safety standards, and an installation works plan that aligns with the existing infrastructure. Explicit requirements are made for experience with CO2 liquefaction, knowledge of Dutch regulations regarding gas safety and the environment, and the ability to deliver within the established timelines and budgets. The procurement follows a competitive procedure with negotiation, requiring the contractor to submit a detailed proposal explaining both the technical and commercial aspects.

Works · Competitive procedure with negotiation · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPCO2 liquefactionstorage plantHVC Alkmaar

01What is being requested

The tender concerns the design, construction and installation of a CO2 liquefaction and storage plant at N.V. HVC in Alkmaar. The project focuses on the development of a fully integrated system capable of liquefying CO2 from industrial processes, storing it, and potentially returning it to the chain. The contracting authority expects a technically sound design, a construction plan meeting quality and safety standards, and an installation works plan that aligns with the existing infrastructure. Explicit requirements are made for experience with CO2 liquefaction, knowledge of Dutch regulations regarding gas safety and the environment, and the ability to deliver within the established timelines and budgets. The procurement follows a competitive procedure with negotiation, requiring the contractor to submit a detailed proposal explaining both the technical and commercial aspects.

Design, construction and installation of a CO2 liquefaction and storage plant at HVC in Alkmaar

45252000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9073×
2Boskalis Nederland B.V.SME8969×
3Van Hattum & Blankevoort N.V.SME8619×
4MobilisUnknown8019×
5Van Oord Nederland BVSME7819×
6G. van der Ven BV AannemingsbedrijfSME7515×

05Tender documents

TN435515 - SF02 Aankondiging van een opdracht 20231021140441pdfOct 21, 2023 · 28 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the specific scope of this assignment?
The assignment includes the design, construction and installation of a CO2 liquefaction and storage plant.
Which aspects of the installation are expected?
The project focuses on the development of a fully integrated system for the liquefaction and storage of CO2 from industrial processes, including the possibility of returning it to the chain.
Which criteria are considered in this tender?
Explicit requirements are made for a technically sound design, a construction plan that meets quality and safety standards, and an installation works plan that aligns with the existing infrastructure.
What specific knowledge is required for execution?
Experience with CO2 liquefaction and knowledge of Dutch regulations regarding gas safety and the environment is required.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159