Design, construction and installation of a CO2 capture plant at HVC in Alkmaar
The project concerns the design, construction, and installation of a CO2 storage plant at N.V. HVC in Alkmaar. HVC is a waste-to-energy plant that emits large quantities of CO2 annually. The tender focuses on an integrated solution that significantly reduces CO2 emissions, complies with Dutch and EU regulations, and integrates seamlessly with the existing infrastructure. The contractor must provide a complete technical design, including engineering, material selection, construction, installation, commissioning, and an initial operational phase. Explicit experience with CO2 capturing, waste-to-energy projects, and large industrial installations is required. The procedure is a competitive procedure with negotiation, whereby the contracting authority expects a detailed specification and a timeline of 24 to 36 months. The contractor must also submit a risk and quality management plan, a safety plan, and an environmental management plan. The tender requires a financially stable company with sufficient subcontractors and a proven track record in similar projects.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
The project concerns the design, construction, and installation of a CO2 storage plant at N.V. HVC in Alkmaar. HVC is a waste-to-energy plant that emits large quantities of CO2 annually. The tender focuses on an integrated solution that significantly reduces CO2 emissions, complies with Dutch and EU regulations, and integrates seamlessly with the existing infrastructure. The contractor must provide a complete technical design, including engineering, material selection, construction, installation, commissioning, and an initial operational phase. Explicit experience with CO2 capturing, waste-to-energy projects, and large industrial installations is required. The procedure is a competitive procedure with negotiation, whereby the contracting authority expects a detailed specification and a timeline of 24 to 36 months. The contractor must also submit a risk and quality management plan, a safety plan, and an environmental management plan. The tender requires a financially stable company with sufficient subcontractors and a proven track record in similar projects.
Design, construction and installation of a CO2 capture plant at HVC in Alkmaar
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the scope of the contract for the CO2 storage plant?
What specific expertise is expected from the contractor?
Which plans must be submitted as part of the contract?
What is the expected lead time of the project?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159