ClosedWorksEuropeanOpenGreen

Design & Build new construction swimming pool Apeldoorn Noord

Gemeente Apeldoorn, team Inkoop · Open · 1 lots · 335433
Type
Works
45210000
Estimated value
€ 34M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Apeldoorn is seeking an integrated Design & Build partner for the construction of a new swimming pool in the north of the city, replacing the current swimming pool 'De Sprenkelaar'. The project is subject to an open procurement procedure and concerns a works contract. The contracting authority expects a complete conceptual design, construction, project management, and delivery within a fixed timeframe and budget. Key points of attention include compliance with Dutch building and safety standards, accessibility for people with disabilities, energy efficiency, and sustainability. The provider must have experience with sports and recreational facilities, be capable of delivering an integrated design and construction process, and be able to present a clear project schedule and quality control system. The municipality emphasizes transparency, collaboration with local stakeholders, and minimizing disruptions during construction.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€34,000,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPswimming poolnew constructiondesign & build

01What is being requested

The Municipality of Apeldoorn is seeking an integrated Design & Build partner for the construction of a new swimming pool in the north of the city, replacing the current swimming pool 'De Sprenkelaar'. The project is subject to an open procurement procedure and concerns a works contract. The contracting authority expects a complete conceptual design, construction, project management, and delivery within a fixed timeframe and budget. Key points of attention include compliance with Dutch building and safety standards, accessibility for people with disabilities, energy efficiency, and sustainability. The provider must have experience with sports and recreational facilities, be capable of delivering an integrated design and construction process, and be able to present a clear project schedule and quality control system. The municipality emphasizes transparency, collaboration with local stakeholders, and minimizing disruptions during construction.

The Municipality of Apeldoorn is developing a new swimming pool to replace swimming pool 'De Sprenkelaar'.

45210000€ 34MWorks
1Design & Build new construction swimming pool Apeldoorn Noord€34,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€34,000,000

04Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9177×
2BINX Smartility B.V.SME9127×
3Hegeman Bouw & Infra B.V.SME8631×
4Van Doorn Geldermalsen B.V.SME8515×
5Pellikaan Bouwbedrijf B.V.SME83
6Bouwgroep Dijkstra DraismaUnknown8211×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of this assignment?
The Municipality of Apeldoorn is developing a new swimming pool to replace the current swimming pool 'De Sprenkelaar'.
What does the Design & Build assignment entail?
The assignment concerns the new construction of a swimming pool in Apeldoorn Noord, where an integrated partner is responsible for the project.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 34 mln

Gegunde waarden in CPV 45 · werken n=3159