The execution of maintenance dredging works by means of the deployment of trailing suction hopper dredgers

North Sea Port Netherlands N.V. · Open · 1 lots · 361429
Type
Works
45252124
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

Framework agreement for the execution of maintenance dredging works with trailing suction hopper dredgers in the tidal ports of North Sea Port for the period 2025-2027.

Works · Open · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendertrailing suction hopper dredgermaintenance dredging worksNorth Sea Port

01What is being requested

Execution of maintenance dredging works by means of the deployment of trailing suction hopper dredgers within the management area of North Sea Port for a period of 36 months.

North Sea Port periodically calls upon external parties for dredging using trailing suction hopper dredgers. The works to be performed by the contractor under the agreement take place within the management area of North Sea Port. The works primarily concern maintenance dredging works in the tidal ports of Buitenhaven, Sloehaven, and Braakmanhaven.

45252124Works
1The execution of maintenance dredging works by means of the deployment of trailing suction hopper dredgers for the period 2025-2027

02Outcome

Awarded

Jan de Nul n.v.

Bidders
10

03Strategic insight

Strategic insight · AI analysis
Ensure an accurate specification of the biofuel rates for B30, B50, and B100. Verify whether the dredging capacity and experience with tidal ports with a 4 meter tidal difference can be demonstrated via separate references.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
Include ISO certificates or other evidence of measures with the bid.Important
The CO2 emissions must be calculated according to the RWS 103 methodology (euro/ton CO2 eq. WTW).Important
The EU ETS CO2 levy should not be included in the current price quotation.Important
It is permitted to only fill in the price for 168 hours per week.Important

05Can I take part?

Technical — Experience with maintenance dredging works in tidal ports with a tidal difference of 4 meters.
Technical — The dredging capacity to be processed with own dredging equipment is at least 600,000 m3 over a period of 2 weeks.

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Award criteria

CO2 Emissions15

The bidder must state the CO2 emissions per trailing suction hopper dredger.

MKI Value15

The bidder must state the MKI value per trailing suction hopper dredger.

Rates / prices70

The bidder must submit rates/prices per offered trailing suction hopper dredger based on the application of normal gas oil, but also rates/prices based on the application of biofuel B30, B50, and B100.

08Process & timeline

requests for additional information
20/01/2025 12:00 +01:00
deadline for the receipt of bids
03/02/2025 12:00 +01:00
opening date
03/02/2025 12:05 +01:00

09Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

10Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10069×
2Heijmans Infra B.V.SME9865×
3De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9826×
4KWS Infra B.V.SME9692×
5ENGIE Infra & Mobility B.V.SME9669×
6Dura Vermeer Infra Regionale Projecten BVSME9658×

11Tender documents

TN502499 - EF30 Aankondiging gegunde opdracht - sectorale richtlijn, standaardregeling 20250331114857pdfApr 1, 2025 · 22 KB
Nota van inlichtingen 2025-01-30-1pdfJan 30, 2025 · 3 KB
Nota van inlichtingen 2025-01-28-1pdfJan 28, 2025 · 15 KB
Nota van inlichtingen 2025-01-23-1pdfJan 23, 2025 · 13 KB
Bijlage 2 ReferentiedocxDec 18, 2024 · 62 KB
Bijlage 5 Concept OvereenkomstpdfDec 18, 2024 · 216 KB
uea_502499_20241213145802pdfDec 18, 2024 · 1584 KB
Bijlage 1 Verklaring omtrent inschrijvingdocxDec 18, 2024 · 60 KB
Bijlage 1B Model K, Verklaring bestuurderdocxDec 18, 2024 · 60 KB
TN502499 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20241216152712pdfDec 18, 2024 · 10 KB
Bijlage 4 Lijst van EisenpdfDec 18, 2024 · 236 KB
Bijlage 3 Inschrijfstaat Raamovereenkomst Sleephopperzuigers 2025-2027 North Sea PortxlsxDec 18, 2024 · 54 KB

12Legal themes that may be relevant here

13Frequently asked questions

What is the nature of the works performed under this agreement?
The agreement concerns the execution of maintenance dredging works by means of the deployment of trailing suction hopper dredgers. These works take place within the management area of North Sea Port.
In which specific port areas are the dredging works performed?
The works primarily concern maintenance dredging works in the tidal ports Buitenhaven, Sloehaven, and Braakmanhaven.
What type of equipment is required for the execution of the assignment?
For the execution of the maintenance dredging works, the deployment of trailing suction hopper dredgers is required.

Automatically compiled from the official tender data and documents.

14Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159