The Gereformeerde Scholengemeenschap Guido de Brès (GSG Guido) intends to realize replacement new construction for the vmbo location at Arnhemseweg 65 in Amersfoort. The contract concerns the full construction of a new school building, including foundation, construction, installations, and finishing. The procurement is a non-open procedure, aimed at a limited number of selected contractors. The contracting authority expects a project with a clear completion date, within the applicable construction and safety standards, with attention to energy efficiency, accessibility, and a modern learning environment. The contracting authority requests a detailed proposal including cost estimation, project planning, quality and safety measures, and an overview of experience with similar school projects.
Works · Restricted · European procedure
01What is being requested
The Gereformeerde Scholengemeenschap Guido de Brès (GSG Guido) intends to realize replacement new construction for the vmbo location at Arnhemseweg 65 in Amersfoort. The contract concerns the full construction of a new school building, including foundation, construction, installations, and finishing. The procurement is a non-open procedure, aimed at a limited number of selected contractors. The contracting authority expects a project with a clear completion date, within the applicable construction and safety standards, with attention to energy efficiency, accessibility, and a modern learning environment. The contracting authority requests a detailed proposal including cost estimation, project planning, quality and safety measures, and an overview of experience with similar school projects.
GSG Guido intends to carry out replacement new construction in Amersfoort for the vmbo location at Arnhemseweg 65.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of this contract?
What does the new construction work entail?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159