ClosedServicesMarktconsultatie

Concession for replacement and operation of existing public charging stations in Noord-Brabant and Limburg

Provincie Noord-Brabant · Marktconsultatie · 1 lots · 393177
Type
Services
65300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This document describes the standardized technical and operational requirements for the installation and management of public AC charging stations.

Services · Marktconsultatie · National procedure

Contracting authority
Contract type
Services
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 65Services

01What is being requested

The assignment concerns the replacement and operation of public AC charging stations in accordance with the standardized Basic Set AC requirements.

The goal of RAL-Zuid is to realize a comprehensive, affordable, accessible, uniform, future-proof, and user-friendly basic network of (public) charging infrastructure in Brabant and Limburg. It intends to further implement this with a new operating contract for the replacement and operation of the 937 public charging stations present in the current contract. In doing so, RAL-Zuid considers it important to, on the one hand, test the feasibility of its ideas with the market and, on the other hand, to gather visions from the market. RAL-Zuid deems this necessary to arrive at a good and feasible

65300000Services
1Concession for replacement and operation of existing public charging stations in Noord-Brabant and Limburg

02Strategic insight

Strategic insight · AI analysis
Ensure that the ISO-27001 certification covers the full scope of management. Prepare the FAT documentation to be delivered within the suspension period. Check whether the hardware is prepared for ISO 15118-20 communication.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
Charging stations for new installations from January 2028 must have a display.Important
Unsafe situations must be made safe within 4 hours.Important
Non-urgent malfunctions must be resolved within four working days.Important
Graffiti or contaminants must be removed within ten working days.Important
The suspension period for delivering FAT documentation is 20 calendar days.Important
The charging cable must be dispatched no later than the following calendar day in case of abandonment.Important

04Can I take part?

Technical — Installation supervisor NEN 3140 and VCA certification within one month after commencement of the agreement.
Professional capability — ISO-27001 certification including management of charging stations and the CSMS.

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

06Likely competitors

#Likely bidderFitWins
1PARKnCHARGE B.V.SME70
2Dutch ChargeUnknown67
3TotalEnergies Marketing Nederland N.V.SME62
4Vattenfall NederlandUnknown62
5TotalEnergies Charging Solutions Nederland B.V.SME62
6Shell Nederland Verkoopmaatschappij B.V.SME62

07Tender documents

Format t.b.v. antwoorden marktconsultatie publieke laadinfrastructuurxlsxSep 17, 2025 · 14 KB
TN546886 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20250917170030pdfSep 17, 2025 · 8 KB
Bijlage 3 Concept Basisset-AC-LadenpdfSep 17, 2025 · 476 KB
Marktconsultatie Concessie vervanging en exploitatie laadpalenpdfSep 17, 2025 · 291 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the purpose of the market consultation for the charging infrastructure in Noord-Brabant and Limburg?
RAL-Zuid is conducting this market consultation to test the feasibility of ideas and to gather market visions. This is necessary to arrive at a good and feasible request for tender for a new operating contract for the replacement and operation of 937 public charging stations.
What is the background of the current operating period in the NAL-Regio Zuid?
The first collective concession (B1) was awarded to Nuon-Heijmans (currently Vattenfall) in 2017. The contract and thus the operating period of this concession expires in January 2027.
What is intended with the new operating contract for the public charging stations?
The goal is to realize a comprehensive, affordable, accessible, uniform, future-proof, and user-friendly basic network of public charging infrastructure in Brabant and Limburg through the replacement and operation of the current 937 public charging stations.
What is the function of the Basic Set AC in the installation of public charging stations?
The Basic Set AC is a standardized set of requirements for tenders for the installation of public AC charging stations. This ensures uniform, efficient, and accelerated installation of charging infrastructure through cooperation between municipalities, grid operators, and market parties.

Automatically compiled from the official tender data and documents.