Circular demolition and asbestos removal Stadstheater Arnhem
The Municipality of Arnhem intends to renovate the Stadstheater Arnhem, a municipal monument of approximately 7,500 m². The renovation consists of the circular demolition of the stage tower, the rear building, and other non-monumental parts (approximately 4,800 m²). Following demolition, the monumental part of 2,800 m² will remain, after which approximately 8,000 m² of new construction will be added. The assignment requires a contractor to perform both the demolition and the asbestos removal, with a focus on minimal environmental impact, low primary raw material consumption, and maximum reuse. The municipality aims for a sustainable, accessible, and future-proof theater, in which circular construction principles are central. The tender is non-public, aimed at a specialized contractor with experience in monumental demolition, asbestos removal, and circular construction.
Works · Restricted · National procedure
01What is being requested
The Municipality of Arnhem intends to renovate the Stadstheater Arnhem, a municipal monument of approximately 7,500 m². The renovation consists of the circular demolition of the stage tower, the rear building, and other non-monumental parts (approximately 4,800 m²). Following demolition, the monumental part of 2,800 m² will remain, after which approximately 8,000 m² of new construction will be added. The assignment requires a contractor to perform both the demolition and the asbestos removal, with a focus on minimal environmental impact, low primary raw material consumption, and maximum reuse. The municipality aims for a sustainable, accessible, and future-proof theater, in which circular construction principles are central. The tender is non-public, aimed at a specialized contractor with experience in monumental demolition, asbestos removal, and circular construction.
Stadstheater Arnhem (municipal monument) (approx. 7,500 m² GFA) is due for renovation. The renovation includes, among other things, the demolition of the stage tower, the 'rear building', and the other, non-monumental, parts. Approximately 4,800 m² will be demolished, after which only the monumental part of approximately 2,800 m² GFA will remain. Approximately 8,000 m² GFA will be added. The design team is currently developing the design to achieve a suitable, contemporary, sustainable, accessible, and future-proof Stadstheater. [newline] For this assignment, the Municipality of Arnhem is loo
02Outcome
Dusseldorp Infra, Sloop en Milieutechniek B.V.
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the scope of the demolition works at the Stadstheater Arnhem?
Which specific works are being carried out during the renovation of the Stadstheater?
What are the sustainability ambitions for this project?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159