Construction Team Partner - Extension, renovation and air handling adjustment at MFC De Salamander in Arnhem
This project includes the extension and reconfiguration of multifunctional complex De Salamander to improve the educational space for two primary schools. The goal is efficient, safe, and future-proof housing that aligns with the specific educational visions.
Works · Restricted · National procedure
01What is being requested
The assignment concerns the extension and limited reconfiguration of MFC De Salamander to facilitate the space requirements of two primary schools. The design team must integrate the space requirements as efficiently and cost-effectively as possible within the extension and the existing building.
Construction Team Phase • Joining the construction team and participating in construction team meetings. See selection document for further details. Execution Phase (subject to decision) The execution of the building, electrical and mechanical installation works on the basis of the Construction Agreement, which includes the STABU specification including appendices. The full description of the Works will be included in the Award Guidelines including appendices. The draft construction team agreement and draft construction agreement will also be provided then.
02Outcome
Rots Bouw B.V.
03Strategic insight
Focus on a smart integration of the new spaces within the existing contours during the design. Ensure that the educational vision of both schools, particularly the flexibility for cross-group working, is central. Optimize the healthy learning environment by paying attention to acoustics and daylight.
04Points of attention
05Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
06Bidders in this segment
07Tender documents
08Legal themes that may be relevant here
09Frequently asked questions
What does the construction team phase entail?
Which works are carried out during the execution phase?
On what basis are the works in the execution phase carried out?
What is the size of the existing MFC?
Automatically compiled from the official tender data and documents.