Construction team contractor new construction office building BAT
The Municipality of Tilburg wishes to involve a main contractor as a construction team advisor starting from the middle of the design and execution phase of a new office building. The contractor provides expertise in all construction disciplines (building, fixed interior, installations, civil engineering, demolition/dismantling) and provides advice on price, quality, maintenance, and planning. They support the design team in preparing an integrated cost estimate and an execution plan. The assignment requires strong coordination between design and execution, sound knowledge of construction team methodologies, and the ability to operate in a non-public procedure. The main contractor must be involved from the DO phase (Design & Build) and ensure the continuity of the project.
Works · Restricted · European procedure
01What is being requested
The Municipality of Tilburg wishes to involve a main contractor as a construction team advisor starting from the middle of the design and execution phase of a new office building. The contractor provides expertise in all construction disciplines (building, fixed interior, installations, civil engineering, demolition/dismantling) and provides advice on price, quality, maintenance, and planning. They support the design team in preparing an integrated cost estimate and an execution plan. The assignment requires strong coordination between design and execution, sound knowledge of construction team methodologies, and the ability to operate in a non-public procedure. The main contractor must be involved from the DO phase (Design & Build) and ensure the continuity of the project.
The contracting authority wishes to have one contractor (acting as main contractor) participate in a construction team as an advisor from the middle of the DO phase. The contractor is responsible for all necessary disciplines, such as building, fixed interior, installations, civil engineering, and demolition/dismantling. The Design Team is responsible for the design up to and including TO/specifications. In the DO and TO phases, the contractor provides advice regarding their execution expertise and substantiates their advice with the consequences for price, quality, maintenance, and planning.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the role of the construction team contractor in this project?
On which aspects must the contractor provide advice during the DO and TO phases?
What is the specific assignment regarding costs and execution?
What are the core elements of the construction assignment?
Automatically compiled from the official tender data and documents.