AwardedWorksEuropeanRestricted

Construction Team Replacing Quay Wall Tuingracht and Surroundings in De Rijp

Stadswerk072 N.V. · Restricted · 1 lots · 365873
Type
Works
45243600
Estimated value
€ 183K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The non-public procurement by Stadswerk072 N.V. concerns the replacement of a 330-meter long quay wall at the Tuingracht in De Rijp. The quay wall, which was renovated in the 1960s, shows signs of deterioration that endanger the safety of surrounding buildings and parked vehicles. In response, a construction team agreement will be concluded to replace the quay wall by 2027 at the latest.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€182,583
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The non-public procurement by Stadswerk072 N.V. concerns the replacement of a 330-meter long quay wall at the Tuingracht in De Rijp. The quay wall, which was renovated in the 1960s, shows signs of deterioration that endanger the safety of surrounding buildings and parked vehicles. In response, a construction team agreement will be concluded to replace the quay wall by 2027 at the latest.

Stadswerk072 intends to conclude a construction team agreement via this non-public procedure with a contractor for the project Replacing Quay Wall Tuingracht and Surroundings in De Rijp. [project Vervangen Kademuur Tuingracht en Omgeving te De Rijp] [project Replacing Quay Wall Tuingracht and Surroundings in De Rijp]. The project primarily concerns the replacement of a 330-meter long quay wall situated on the south side of the canal. The quay wall was completely restored in the 1960s, during which 4 layers of masonry were replaced and reinforcements/anchors were applied. Monitoring data has

45243600Works
1Construction Team Replacing Quay Wall Tuingracht and Surroundings in De Rijp

02Outcome

Awarded

Oosterhof Holman Beton- en Waterbouw B.V.

Award value
€182,583
Bidders
5

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME10058×
2Ploegam B.V.SME9922×
3Boskalis Nederland B.V.SME9769×
4KWS Infra B.V.SME9692×
5Combinatie Heijmans - SWARCOUnknown9673×
6Van Gelder BVSME9653×

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the quay wall project?
The project primarily concerns the replacement of a 330-meter long quay wall situated on the south side of the canal.
What is the reason for the replacement of the quay wall?
Monitoring data has shown that the quay wall is degrading in several places. The replacement is necessary to ensure the safety of the adjacent buildings and parked cars.
What is the intended completion date of the works?
The intention is to replace the quay wall by 2027 at the latest.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159