Construction Team New Build Raw Materials Hall
De Meerlanden Holding N.V. intends to form a construction team consisting of the contracting authority, the engineering firm Witteveen+Bos, and a contractor to be contracted along with its construction team partner(s). The objective is to jointly carry out the preparations for the new build of a raw materials hall and subsequently enter into a construction contract for the execution. The construction team model offers the opportunity to optimally utilize and manage risks and opportunities, with a focus on the transition from Final Design (DO) to Technical Design (TO) and Ready-for-Construction Design (UO). The procedure is public and no CPV code has been specified. The tender focuses on a collaboration in which all parties contribute their expertise to ensure an efficient, cost-effective, and timely delivery of the project.
Works · Open · European procedure
01What is being requested
De Meerlanden Holding N.V. intends to form a construction team consisting of the contracting authority, the engineering firm Witteveen+Bos, and a contractor to be contracted along with its construction team partner(s). The objective is to jointly carry out the preparations for the new build of a raw materials hall and subsequently enter into a construction contract for the execution. The construction team model offers the opportunity to optimally utilize and manage risks and opportunities, with a focus on the transition from Final Design (DO) to Technical Design (TO) and Ready-for-Construction Design (UO). The procedure is public and no CPV code has been specified. The tender focuses on a collaboration in which all parties contribute their expertise to ensure an efficient, cost-effective, and timely delivery of the project.
The contracting authority intends to award a contract to jointly carry out, within a construction team with a Contractor and its construction team partner(s), the preparations for the New Build of the Raw Materials Hall and subsequently enter into a construction contract with the relevant Contractor for the realization of the New Build of the Raw Materials Hall. The contracting authority wishes to collaborate on this project in a construction team consisting of the contracting authority, its engineering firm Witteveen+Bos, and the contractor to be contracted and its participating construction
02Outcome
Mobilis
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What is the purpose of the construction team model for the New Build Raw Materials Hall?
Which parties constitute the construction team for this project?
What is the intended next step after the preparation phase in the construction team?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159