Construction Team Redesign Grotestraat Noord Almelo

Gemeente Almelo · Andere procedure in meerdere fasen · 1 lots · 339600
Type
Works
45222000
Estimated value
€ 1,60M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Construction team phase for the Grotestraat Noord in Almelo, in which the board follows the design towards an Executive Design (UO) and prepares a RAW specification; subsequently, the work may actually be executed. No deadlines or price considerations are known; the procedure is open and non-digital.

Works · Andere procedure in meerdere fasen · National procedure

Contracting authority
Contract type
Works
Andere procedure in meerdere fasen
Estimated value
€1,600,000
estimated value
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Construction team phase for the Grotestraat Noord in Almelo, in which the board follows the design towards an Executive Design (UO) and prepares a RAW specification; subsequently, the work may actually be executed. No deadlines or price considerations are known; the procedure is open and non-digital.

This tender relates to a construction team phase for the preparation of the project and, if the negotiations for this are successful, the realization of the Works based on the RAW specification prepared during the preparation phase. The construction team starts at the beginning of the elaboration phase and a Concept VO is available. The Final Design is in the final stages. The construction team's task is to further elaborate the design into an Executive Design (UO) and to implement any necessary adjustments. The contractor's activities during the construction team phase include, among others:

45222000€ 1,60MWorks
1Construction Team Redesign Grotestraat Noord Almelo€1,600,000

02Value in context

€1,600,000

03Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9158×
2KWS Infra B.V.SME9092×
3BAM Infra B.V.SME9077×
4Combinatie Heijmans - SWARCOUnknown9074×
5Van Gelder BVSME8953×
6Sweco Nederland B.V. SME8971×

04Legal themes that may be relevant here

05Frequently asked questions

What is the specific assignment of the construction team during the preparation phase?
The construction team's task is to further elaborate the Final Design (DO) into an Executive Design (UO) and to implement any necessary adjustments.
What activities are involved for the contractor during the construction team phase?
The activities include elaborating the DO into a UO, preparing a RAW specification, preparing budgets for the realization phase, and providing support for Environmental Management.
What is the relationship between the construction team phase and the final realization of the work?
If the negotiations following the construction team phase are successful, the realization of the Works will take place based on the RAW specification prepared during the preparation phase.

Automatically compiled from the official tender data and documents.