ClosedWorksEuropeanRestricted

Construction team major maintenance of 7 movable structures waterway section 10 - Merwedekanaal

Provincie Zuid-Holland · Restricted · 1 lots · 317221
Type
Works
45000000
Estimated value
€ 11M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Province of Zuid-Holland intends to realize the major maintenance of seven movable bridges on the Merwedekanaal via a construction team. The assignment is divided into an engineering phase in which the construction team reviews the preliminary design, the final design, and the contract specifications, followed by an execution phase in which one or more RAW specifications are realized and the contractor handles the delivery. Following delivery, a two-year management and maintenance period follows. The total target budget amounts to € 11,000,000.00 excluding VAT. The procedure is non-public, allowing a limited number of certified companies to be approached. The assignment requires multidisciplinary collaboration between engineers, contractors, and maintenance professionals and demands sound project management capacity.

Works · Restricted · European procedure

European
Contracting authority
Zuid-Holland
Contract type
Works
Restricted
Estimated value
€11,000,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
's-Gravenhage, Zuid-Holland
CharacteristicsCPV 45WorksEU tenderconstruction teammajor maintenancemovable bridges

01What is being requested

The Province of Zuid-Holland intends to realize the major maintenance of seven movable bridges on the Merwedekanaal via a construction team. The assignment is divided into an engineering phase in which the construction team reviews the preliminary design, the final design, and the contract specifications, followed by an execution phase in which one or more RAW specifications are realized and the contractor handles the delivery. Following delivery, a two-year management and maintenance period follows. The total target budget amounts to € 11,000,000.00 excluding VAT. The procedure is non-public, allowing a limited number of certified companies to be approached. The assignment requires multidisciplinary collaboration between engineers, contractors, and maintenance professionals and demands sound project management capacity.

Carrying out major maintenance on 7 movable bridges by means of a construction team. The major maintenance is carried out in two phases, namely: 1. Engineering phase / construction team phase; Start of construction team, review of preliminary design, final design, contract specifications; 2. Execution phase; a. Realization of one or more RAW specifications including delivery by the Contractor. b. Management and maintenance; 2-year management and maintenance of the structures after delivery. The target budget for this assignment amounts to € 11,000,000.00 excluding VAT

45000000€ 11MWorks
1Lot 1

02Outcome

Awarded

Mourik Infra B.V.

Award value
€11,000,000
vs. estimate
0%

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€11,000,000

05Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME9692×
2Dura Vermeer Infra Regionale Projecten BVSME9658×
3BAM Infra B.V.SME9677×
4Combinatie Heijmans - SWARCOUnknown9473×
5Van Gelder BVSME9453×
6Heijmans Infra B.V.SME9365×

06Legal themes that may be relevant here

07Frequently asked questions

What is the structure of the assignment for the maintenance of the movable structures?
The assignment consists of an engineering phase (review of the preliminary design, final design, and contract specifications), an execution phase (realization of one or more RAW specifications including delivery), and a subsequent two-year period of management and maintenance.
What does the engineering phase of this construction team project entail?
In the engineering phase/construction team phase, the construction team starts, during which the preliminary design, the final design, and the contract specifications are reviewed.
How long is the management and maintenance period after realization?
Following the delivery of the works, a two-year period of management and maintenance of the seven movable structures follows.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 11 mln

Gegunde waarden in CPV 45 · werken n=3159