ClosedWorksOpen

Construction team for facade renovation, roofing works and sustainability of the town hall

Gemeente Alphen aan den Rijn · Open · 1 lots · 330485
Type
Works
45453000
Estimated value
€ 4,77M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Alphen aan den Rijn wishes to have the facade of its town hall repaired due to leakage and waterproofing issues. A specialized agency has determined that the current facade construction, including the so-called 'spaghetti windows', does not meet the requirements. The facade must be partially and temporarily dismantled and placed in scaffolding to carry out the works. Simultaneously, the outdated plastic roofing will be replaced and the insulation upgraded to improve energy performance. The assignment is being tendered as a construction team because the scope has not yet been fully crystallized; the construction team phase includes design, preparation, and risk analysis. The municipality, two consultants, and a cost expert work together to ensure optimal cooperation, planning, and budget control. The construction team phase grants the contractor the exclusive right to submit a bid for the execution phase. The objectives are efficient process control, minimal disruption to services, sustainable renovation, and pleasant cooperation.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€4,773,607
estimated value
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksfacade renovationroofingsustainability

01What is being requested

The Municipality of Alphen aan den Rijn wishes to have the facade of its town hall repaired due to leakage and waterproofing issues. A specialized agency has determined that the current facade construction, including the so-called 'spaghetti windows', does not meet the requirements. The facade must be partially and temporarily dismantled and placed in scaffolding to carry out the works. Simultaneously, the outdated plastic roofing will be replaced and the insulation upgraded to improve energy performance. The assignment is being tendered as a construction team because the scope has not yet been fully crystallized; the construction team phase includes design, preparation, and risk analysis. The municipality, two consultants, and a cost expert work together to ensure optimal cooperation, planning, and budget control. The construction team phase grants the contractor the exclusive right to submit a bid for the execution phase. The objectives are efficient process control, minimal disruption to services, sustainable renovation, and pleasant cooperation.

The reason for putting this Assignment out to tender is the need to have the facade of the town hall repaired. This repair is necessary because the facade is leaking. Research by a specialized agency shows that the applied facade construction, as a result of architectural principles and inaccurate execution, does not meet the requirements for waterproofing. Therefore, adjustments and replacement of the so-called 'spaghetti windows' is inevitable. The town hall was designed by an architect, which means that the design is protected by copyright. Due to the complex facade structure, the zinc faca

45453000€ 4,77MWorks
1Construction team for facade renovation, roofing works and sustainability of the town hall€4,773,607

02Value in context

€4,773,607

03Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9577×
2Combinatie Heijmans - SWARCOUnknown9573×
3Dura Vermeer Infra Regionale Projecten BVSME9558×
4Van Gelder BVSME9453×
5Boskalis Nederland B.V.SME9269×
6Heijmans Infra B.V.SME9265×

04Legal themes that may be relevant here

05Frequently asked questions

What is the specific task of the construction team phase in this assignment?
The task of the construction team concerns the preparation (design) of the execution of the repair of the facade and roof structures and additional sustainability. Within the construction team, the renovation is jointly worked out within the framework conditions, intentions, and ambitions of the municipality, while simultaneously anticipating bottlenecks and risks.
What right does the contractor have after the conclusion of the construction team phase?
Characteristic of this construction team is that the contractor in the construction team phase has the first and only right to submit a bid for the execution phase.
What are the main objectives of the renovation of the town hall?
The objectives are efficient process control, optimal cooperation and communication, execution within planning and budget, minimal disruption to ongoing services, a sustainable renovation of the facade and the roof, and pleasant cooperation between all parties.
What works will be carried out on the facade and the roof?
The works include repairing the leaking facade (including adjustment/replacement of the spaghetti windows), the partial temporary dismantling of the zinc facade cladding, the replacement of the plastic roofing, and the improvement of the insulation for sustainability.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,8 mln

Gegunde waarden in CPV 45 · werken n=3159