AwardedServicesEuropeanOpen

Construction project management including cost consultancy and site supervision

Type
Services
71240000 · Services in the field
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns the new construction of the educational location Zone.college Almelo to achieve a green campus for VMBO and MBO. The design must comply with specific spatial frameworks and a vision of sustainable, practice-oriented education.

Services · Open · European procedure

European
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Services in the field of architecture, building science, and planning
Location
Netherlands
CharacteristicsCPV 71ServicesEU tenderconstruction managementsite supervisioncost consultancy

01What is being requested

New construction of the educational facilities for the Zone.college Almelo, aimed at a Green campus. The assignment comprises a total spatial framework of 10,816 m2 gross floor area for both VMBO and MBO.

The assignment concerns services regarding construction project management including cost consultancy and site supervision for the expansion/new construction of the school in Almelo with 10,814 m² GFA. It concerns a location for secondary education and MBO education and the total available budget is estimated at approx. €17 million excl. VAT. The objective of the assignment is to select a construction management firm for the guidance and support throughout the entire process of the expansion/new construction of the Almelo location, including the school environment containing the educational p

71240000Services
1Construction project management including cost consultancy and site supervision

02Outcome

Awarded

bbn adviseurs

Bidders
3

03Strategic insight

Strategic insight · AI analysis
Focus on the practice-oriented learning environment during the design by optimizing the relationship between practical spaces and the outdoor space. Ensure a layout that promotes social safety and transparency without losing the desired small-scale character. Integrate technology and sustainability as visible elements in the students' learning environment.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
The facilities must be visibly sustainable through the use of natural materials and climate control.Important
A flexible shell must be created to respond to changing student numbers.Important
The layout must offer educational customization for the specific courses.Important
The connection between inside and outside must be strengthened by living greenery within the building.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Haskoning Nederland B.V.SME96129×
2Sweco Nederland B.V. SME9695×
3Antea Nederland BVSME9677×
4HEVO B.V.SME9214×
5abcnova B.V.SME9118×
6Witteveen+Bos Raadgevende ingenieurs B.V.SME8988×

08Tender documents

Bijlage 5 Takenlijst STB en CalculatiebladxlsxJan 18, 2026 · 80 KB
Aanbestedingsdocument Bouwprojectmanagement Zone.college AlmelopdfJan 18, 2026 · 617 KB
Bijlage 2 UEApdfJan 18, 2026 · 419 KB
Bijlage 6 Ruimtelijk Functioneel Programma van EisenpdfJan 18, 2026 · 2356 KB
Bijlage 3 DNR-2011-herzien-juli-2013pdfJan 18, 2026 · 142 KB
Bijlage 1 Concept OvereenkomstpdfJan 18, 2026 · 271 KB
TN566531 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20260116112955pdfJan 18, 2026 · 142 KB
Bijlage 4 ReferentiebeschrijvingdocxJan 18, 2026 · 23 KB
Bijlage 7 Planning ver-nieuwbouw AlmelopdfJan 18, 2026 · 194 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the exact size of the school location to be realized?
The expansion/new construction concerns a school location with a gross floor area (GFA) of 10,814 m².
What is the objective of the assignment for the construction management firm?
The selection of a firm for the full guidance and support of the expansion/new construction process, including the school environment and educational pavilions. This includes the preparation, compiling the VO and DO, and the guidance towards execution by means of a construction team.
Which specific works are requested within the assignment?
The assignment includes construction project management, cost consultancy, and site supervision for the expansion/new construction of the school location.
What is the intended commissioning of the new school location?
The commissioning of the new construction is planned for the 2027-2028 school year.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713