ClosedServicesEuropeanOpen

Construction Management

Type
Services
71500000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
4 criteria
Assess manuallyconfidence high

This tender concerns the assignment for construction management for the new construction of an educational institution in Papendrecht for a period of six years.

Services · Open · European procedure

EuropeanComplete timeline
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 71ServicesEU tender

01What is being requested

Performing Construction Management for the Vijzellaan location of CSG De Lage Waard in Papendrecht with a duration of 6 years.

Performing Construction Management for the Vijzellaan location of CSG De Lage Waard in Papendrecht.

71500000Services
1Construction Management

02Strategic insight

Strategic insight · AI analysis
When submitting the bid, focus strongly on the qualitative components as these are worth 70 points in total. Ensure a very strong presentation and a detailed plan of approach to achieve the maximum score. Do not forget that the total price also determines a substantial part of the award.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 3
The offer must be valid for at least 90 days after the submission date.Important
The execution takes place within the context of a new construction project that is realized in phases.Important
The schedule is dependent on the VO phase which starts after the selection of the project management.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Award criteria

Plan of Approach30

Assessment of the submitted plan of approach.

CVs team and organization20

Assessment of the CVs of the team and the organization.

Presentation Plan of Approach20

Assessment of the presentation of the plan of approach.

Total price30

Assessment of the total price.

06Process & timeline

Requests for additional information
29/08/2025 12:00 +02:00
Deadline for receipt of tenders
19/09/2025 12:00 +02:00
Opening date
19/09/2025 12:15 +02:00

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1Sweco Nederland B.V. SME9495×
2abcnova B.V.SME8618×
3ICS Adviseurs B.V.SME8610×
4BDG Architecten Ingenieurs Zwolle B.V.SME8515×
5HEVO B.V.SME8314×
6Deerns Nederland B.V.SME8020×

09Tender documents

TN534285 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20251208165125pdfDec 10, 2025 · 8 KB
Bijlage 04_Concept Overeenkomst_Bouwmanagement_CSG De Lage Waard_05-09-2025docxSep 5, 2025 · 47 KB
Bijlage 06_Calculatieblad incl. demarcatielijst_Bouwmanagement_CSG De Lage Waard_05-09-2025xlsxSep 5, 2025 · 98 KB
Nota van Inlichtingen II_Bouwmanagement_CSG De Lage WaardxlsxSep 5, 2025 · 37 KB
Bijlage 05B_Aanvullingen op en afwijkingen van DNR 2011_Bouwmanagement_CSG De Lage Waard_05-09-2025docxSep 5, 2025 · 24 KB
Aanbestedingsleidraad_Bouwmanagement_CSG De Lage Waard_05-09-2025pdfSep 5, 2025 · 918 KB
Bijlage 01_Programma van Eisen incl. demarcatie_Bouwmanagement_CSG De Lage Waard_18-07-2025xlsxJul 18, 2025 · 56 KB
Nota van Inlichtingen I_Bouwmanagement_CSG De Lage WaardxlsxJul 18, 2025 · 50 KB
Bijlage 02_Verklaring omtrent Inschrijving_Bouwmanagement_CSG De Lage Waard_18-07-2025docxJul 18, 2025 · 42 KB
Bijlage 07_Uniform Europees Aanbestedingsdocument_Bouwmanagement_CSG De Lage WaardpdfJun 29, 2025 · 330 KB
Bijlage 08_1663807-0035_v0.1-Annex 7 Ambitiedocument CSG De Lage Waard Papendrecht d.d. 13-12-2023 (DEF)docxJun 29, 2025 · 5559 KB
TN534285 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250627134124pdfJun 29, 2025 · 8 KB

10Legal themes that may be relevant here

11Frequently asked questions

On which standard is the task description for the construction management works based?
The standard task description is based on the DNR-STB 2014, developed by ONRI and BNA, and should be used in conjunction with the DNR 2011 (July 2013 version).
Which roles can be performed by a single party within this project?
A party can perform multiple roles. For example, the architect performs the roles of ARC (architect), LAN (landscape architect), and INT (interior architect).
What is the position of the safety expert within the project team?
The safety expert will, at the request of PRJ (project management), attend the design team meetings and/or construction meetings.
Is a proposal to limit liability to three times the advisory costs with a maximum of € 2,500,000.00 accepted?
No, the proposal to limit the damages to be compensated by the contractor to three times the amount of the advisory costs with a maximum of € 2,500,000.00 has not been approved.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713