ClosedWorksCompetitive procedure with negotiation

Construction of River Cruise Terminal pier

North Sea Port Flanders nv van publiek recht · Competitive procedure with negotiation · 297681
Type
Works
45244200
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

North Sea Port Flanders nv is looking for a partner for the construction of a new pier at the Rigakaai in the Grootdok in Gent. The pier must be able to moor and unmoor a maximum of four river cruise ships simultaneously. The construction consists of steel pipe piles with a concrete deck, is approximately 85 m long and 6 m wide, and is equipped with fendering, a gutter (caniveau), and lighting on the walkway. In addition, four fender piles must be placed along the pier. Before construction can begin, three old service piers must first be demolished. The assignment includes all measurements, preparatory works, and the realization of the construction works according to the selection criteria. The project requires precise planning, safety and environmental compliance, and cooperation with the port authorities.

Works · Competitive procedure with negotiation · National procedure

Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
10:10
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksriver cruise piersteel pilesconcrete deck

01What is being requested

North Sea Port Flanders nv is looking for a partner for the construction of a new pier at the Rigakaai in the Grootdok in Gent. The pier must be able to moor and unmoor a maximum of four river cruise ships simultaneously. The construction consists of steel pipe piles with a concrete deck, is approximately 85 m long and 6 m wide, and is equipped with fendering, a gutter (caniveau), and lighting on the walkway. In addition, four fender piles must be placed along the pier. Before construction can begin, three old service piers must first be demolished. The assignment includes all measurements, preparatory works, and the realization of the construction works according to the selection criteria. The project requires precise planning, safety and environmental compliance, and cooperation with the port authorities.

Annually, North Sea Port receives approximately 300 river cruises at the Rigakaai in the Grootdok in Gent. To be able to receive these river cruises in a high-quality manner, North Sea Port is looking for a partner for the construction of a pier intended for river cruises. This pier serves to moor and unmoor (a maximum of) 4 river cruise ships simultaneously. The new pier will consist of steel pipe piles with a concrete deck and is approximately 85 meters long and approximately 6 meters wide. The pier will be equipped with fendering and a gutter (caniveau). The walkway will be provided with li

45244200Works

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9570×
2KWS Infra B.V.SME9492×
3BAM Infra B.V.SME9377×
4Combinatie Heijmans - SWARCOUnknown9373×
5Heijmans Infra B.V.SME9365×
6Dura Vermeer Infra Regionale Projecten BVSME9358×

04Tender documents

TN411956 - SF05 Aankondiging van een opdracht - speciale sectoren 20230512102433pdfMay 12, 2023 · 31 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific assignment of this tender?
The assignment concerns the construction of a new pier at the Rigakaai in the Grootdok in Gent, intended for the simultaneous mooring and unmooring of a maximum of four river cruise ships.
What are the technical specifications of the new pier?
The pier consists of steel pipe piles with a concrete deck, has dimensions of approximately 85 meters long and 6 meters wide, and is equipped with fendering, a gutter (caniveau), and lighting on the walkway.
Which preparatory works must be carried out?
Before the construction of the new pier can take place, three old service piers must first be demolished. The assignment also includes all measurements and preparatory works.
How is the mooring of the cruise ships along the pier facilitated?
In the extension of the pier, four fender piles must be placed to allow the cruise ships to moor along the length of the pier.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159