ClosedServicesOpenGreen

Improved utilization of electricity network capacity

Type
Services
65300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Ministry of Economic Affairs and Climate Policy (EZK) is requesting innovative products and services that increase the utilization rate of existing or newly constructed electricity networks. The assignment focuses on solutions that deploy grid capacity more efficiently, for example through smart grids, demand response, energy storage, and advanced grid management software. Parties must demonstrate that their offering is scalable, cost-effective, and technically compatible with current infrastructure and regulations. The focus lies on achieving a higher energy density, reducing capacity constraints, and facilitating the energy transition. The assignment is open and aimed at stimulating market innovation within the energy sector.

Services · Open · National procedure

Sustainability counts
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
17:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 65ServicesGreen / SPPelectricity network capacitysmart gridenergy storage

01What is being requested

The Ministry of Economic Affairs and Climate Policy (EZK) is requesting innovative products and services that increase the utilization rate of existing or newly constructed electricity networks. The assignment focuses on solutions that deploy grid capacity more efficiently, for example through smart grids, demand response, energy storage, and advanced grid management software. Parties must demonstrate that their offering is scalable, cost-effective, and technically compatible with current infrastructure and regulations. The focus lies on achieving a higher energy density, reducing capacity constraints, and facilitating the energy transition. The assignment is open and aimed at stimulating market innovation within the energy sector.

The Ministry of Economic Affairs and Climate Policy (EZK) challenges parties to develop new products and services with the aim of better utilizing the capacity of existing or newly to be constructed electricity networks, i.e.: increasing the utilization rate of electricity networks.

65300000Services
1Improved utilization of electricity network capacity

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

03Likely competitors

#Likely bidderFitWins
1Dutch ChargeUnknown62
2TotalEnergies Charging Solutions Nederland B.V.SME58
3TotalEnergies Marketing Nederland N.V.SME50
4BAM Energie & Water B.V.SME50
5Fudura B.V.SME46
6KenterUnknown46

04Legal themes that may be relevant here

05Frequently asked questions

What is the objective of this assignment?
The objective is to develop new products and services that increase the utilization rate of existing or newly to be constructed electricity networks.
Which solutions are targeted in this tender?
The focus is on solutions for more efficient deployment of grid capacity, such as smart grids, demand response, energy storage, and advanced grid management software.
What requirements are imposed on the proposed solutions?
Parties must demonstrate that their offering is scalable, cost-effective, and technically compatible with current infrastructure and regulations.
What role does sustainability play in this assignment?
Sustainability criteria apply to this tender.

Automatically compiled from the official tender data and documents.