Specification 2483 (UAV-GC) N345/N348 Brummen Roundabout and Oekense beek eco-provision
Specification 2483 concerns a non-public Works contract (UAV-GC) for the improvement of the Brummen roundabout and the eco-provision at the Oekense beek. The province of Gelderland aims to combine design and execution expertise in an E&C contract so that innovation and quality from the construction sector can benefit.
Works · Restricted · European procedure
01What is being requested
Specification 2483 concerns a non-public Works contract (UAV-GC) for the improvement of the Brummen roundabout and the eco-provision at the Oekense beek. The province of Gelderland aims to combine design and execution expertise in an E&C contract so that innovation and quality from the construction sector can benefit.
Reason for project execution The reason for the project is to improve accessibility at the current roundabout. Due to heavy traffic, congestion occurs during peak moments and it has been calculated that capacity will fall even further short in the future. Furthermore, the wearing course of the N345 between the roundabout with the Kwazenboschweg and the connection to the new De Hoven bypass is at the end of its service life. Additionally, a section of this carriageway, between the roundabout and Cortenoeverseweg, will be modified so that less asphalt will be present in the future (circular des
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the goal of the project at the Brummen roundabout and the N345?
What works are being carried out regarding the eco-provision?
On which type of contract is this assignment based?
How is design and execution expertise utilized in this project?
What role does circular design play in the modification of the carriageway?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159