ClosedWorksEuropeanRestricted

Specification 2483 (UAV-GC) N345/N348 Brummen Roundabout and Oekense beek eco-provision

Provincie Gelderland · Restricted · 1 lots · 337616
Type
Works
45233141
Estimated value
€ 7,50M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Specification 2483 concerns a non-public Works contract (UAV-GC) for the improvement of the Brummen roundabout and the eco-provision at the Oekense beek. The province of Gelderland aims to combine design and execution expertise in an E&C contract so that innovation and quality from the construction sector can benefit.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€7,500,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Specification 2483 concerns a non-public Works contract (UAV-GC) for the improvement of the Brummen roundabout and the eco-provision at the Oekense beek. The province of Gelderland aims to combine design and execution expertise in an E&C contract so that innovation and quality from the construction sector can benefit.

Reason for project execution The reason for the project is to improve accessibility at the current roundabout. Due to heavy traffic, congestion occurs during peak moments and it has been calculated that capacity will fall even further short in the future. Furthermore, the wearing course of the N345 between the roundabout with the Kwazenboschweg and the connection to the new De Hoven bypass is at the end of its service life. Additionally, a section of this carriageway, between the roundabout and Cortenoeverseweg, will be modified so that less asphalt will be present in the future (circular des

45233141€ 7,50MWorks
1Specification 2483 (UAV-GC) N345/N348 Brummen Roundabout and Oekense beek eco-provision€7,500,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€7,500,000

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9965×
2KWS Infra B.V.SME9892×
3Van Gelder BVSME9853×
4De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9826×
5Gebr. van Kessel Wegenbouw B.V.SME9820×
6NTP B.V.SME9822×

05Legal themes that may be relevant here

06Frequently asked questions

What is the goal of the project at the Brummen roundabout and the N345?
The project aims to improve accessibility at the current roundabout to reduce congestion caused by heavy traffic. Additionally, the wearing course of the N345 will be renewed and the intersection with the Cortenoeverseweg will be modified to make the crossing safer for tractors.
What works are being carried out regarding the eco-provision?
An eco-provision is being constructed to improve the possibilities for fauna under the N345. The existing badger tunnel and concrete culvert will be modified so that the fauna passage becomes suitable for the passage of larger animals.
On which type of contract is this assignment based?
The assignment is awarded as an Engineer and Construct (E&C) contract based on the UAV-GC 2005. In this, the preparatory works, such as parts of the design and the execution, are integrated.
How is design and execution expertise utilized in this project?
Through the application of an integrated contract form, design and execution expertise are combined. This enables the Contractor to optimize the realization of the Works and to implement process and product innovations according to the fit for purpose principle.
What role does circular design play in the modification of the carriageway?
In the modification of the carriageway between the roundabout and the Cortenoeverseweg, there will be less asphalt present in the future through the application of circular design.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 7,5 mln

Gegunde waarden in CPV 45 · werken n=3159