Specification 24-02 - Execution of Fast Cycle Route F 58 sub-projects 2 and 3

Gemeente Roosendaal · Open · 1 lots · 346490
Type
Works
45000000
Estimated value
€ 1,71M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender concerns the execution of sub-projects 2 and 3 of the F58 fast cycle route in the Municipality of Roosendaal. Sub-project 2 focuses on the construction of a bicycle tunnel (underpass) and sub-project 3 on the construction of the remaining cycle path, including rainwater drainage (HWA) and wadis. The contract is a national, open tender for works with CPV code 45000000. The tender is closed, was published on 21 August 2024 (TenderNed 346490) and no deadline or discernible value is mentioned.

Works · Open · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Open
Estimated value
€1,710,000
estimated value
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPP

01What is being requested

This tender concerns the execution of sub-projects 2 and 3 of the F58 fast cycle route in the Municipality of Roosendaal. Sub-project 2 focuses on the construction of a bicycle tunnel (underpass) and sub-project 3 on the construction of the remaining cycle path, including rainwater drainage (HWA) and wadis. The contract is a national, open tender for works with CPV code 45000000. The tender is closed, was published on 21 August 2024 (TenderNed 346490) and no deadline or discernible value is mentioned.

This is a national open tender for works for sub-projects 2 and 3 of the F58 fast cycle route. The work to be performed is located at the Wouwseweg and the Wouwbaan, on territory of Rijkswaterstaat in the Municipality of Roosendaal. Sub-project 2 concerns the construction of a bicycle tunnel (underpass) and sub-project 3 concerns the construction of the remaining part of the F58 cycle path. During the execution of sub-project 3, a rainwater drainage system originating from the Wouwseweg must also be installed, including the construction of wadis along the Wouwbaan. The work mainly consists o

45000000€ 1,71MWorks
1Specification 24-02 - Execution of Fast Cycle Route F 58 sub-projects 2 and 3€1,710,000

02Value in context

€1,710,000

03Likely competitors

#Likely bidderFitWins
1Den Ouden Aannemingsbedrijf B.V.SME10023×
2Boskalis Nederland B.V.SME9969×
3KWS Infra B.V.SME9892×
4Combinatie Heijmans - SWARCOUnknown9773×
5BAM Infra B.V.SME9777×
6Dura Vermeer Infra Regionale Projecten BVSME9758×

04Legal themes that may be relevant here

05Frequently asked questions

What is the specific content of sub-project 2 of the F58 fast cycle route?
Sub-project 2 includes the construction of a bicycle tunnel, also referred to as an underpass.
Which works are carried out within sub-project 3?
Sub-project 3 concerns the construction of the remaining part of the F58 cycle path, including the installation of a rainwater drainage system originating from the Wouwseweg and the construction of wadis along the Wouwbaan.
Which civil engineering works are part of the assignment?
The work includes, among others, earthworks, the installation of foundations, sewerage, open and closed paving, a tunnel box, a noise barrier and water storage.
Are there sustainability criteria applicable to this tender?
Yes, sustainability criteria are applicable to this assignment.

Automatically compiled from the official tender data and documents.