PlannedWorksMarktconsultatieGreen

Housing for transport distribution station components

Enexis Netbeheer BV · Marktconsultatie · 1 lots · 416697
Type
Works
45000000 · Construction work
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Enexis is conducting a market consultation to optimize the realization of 800 transport distribution stations in terms of speed, cost, and sustainability.

Works · Marktconsultatie · National procedure

Sustainability countsComplete timeline
Contracting authority
Enexis Netbeheer BV
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Construction work
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPTransport distribution stationEnergy transition

01What is being requested

Market consultation regarding the realization of 800 transport distribution stations, where the focus lies on structurally accelerating, simplifying, and sustainably improving the component buildings and the realization process.

Ambition and Market Consultation Enexis sees opportunities to achieve a further efficiency leap in speed and costs. Although the current method provides us with speed on the day of installation, we have doubts as to whether the current chain structure (involving many third parties and separate component suppliers) is the most optimal in the long term. We want to leverage the inventiveness of the market to determine whether the buildings should remain part of the direct supply, or whether integrated delivery by the main contractor offers more advantages. Although the energy transition imposes

45000000Works
1Housing for transport distribution station components

02Strategic insight

Strategic insight · AI analysis
<ul Focus on the core question when answering: how can realization be accelerated (target: 3 stations per week) and costs be reduced (target: at least 10% cheaper)?. Substantiate innovative solutions specifically in the areas of lead time, quality, cost, and sustainability (TCO). Clearly indicate from which expertise (Product, Service, or Combination) you are answering the questions.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The response to the questions should be limited to approximately 3 pages.Important
When adding attachments, explicit references must be made to the relevant passages.Important
Participation in the market consultation offers no better or worse position in a future procurement.Important
Costs incurred for participation in the market consultation will not be reimbursed.Important

04Can I take part?

Technical · 3
Possession of a VCA** or VCA P certificate.Technical
Possession of an ISO 9001 certificate.Technical
Possession of an ISO 14001 certificate.Technical

05Process & timeline

Publication of consultation document and invitation to parties
20 maart 2026
Deadline for submitting questions following the market consultation document
10 april 2026 om 10:00u
Publication of Note of Clarification
15 april 2026
Deadline for submitting written response to the consultation document
24 april 2026 om 12:00u

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Likely competitors

#Likely bidderFitWins
1Arcadis Nederland B.V.SME98116×
2Antea Nederland BVSME9761×
3Sweco Nederland B.V. SME9671×
4Haskoning Nederland B.V.SME95100×
5Croonwolter&dros B.V.SME9536×
6Unica Installatietechniek B.V.SME9522×

08Tender documents

Ingediende vragen en antwoordenxlsxApr 15, 2026 · 24 KB
Marktconsultatie behuizing transportverdeelstations_DEFdocxMar 19, 2026 · 517 KB
Foto en beeldmateriaalzipMar 19, 2026 · 62076 KB
TN578162 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260319184928pdfMar 19, 2026 · 229 KB

09Legal themes that may be relevant here

10Frequently asked questions

What are the main objectives for the realization of the component buildings?
The objectives are accelerating the realization (approx. 3 stations per week), a cost reduction of at least 10% compared to the current approach, sustainable and low-maintenance construction (TCO), stimulating innovation, and providing opportunities for scaling up and flexibility in production and execution.
What is the indicative lead time for the realization of TVRS stations?
For the realization of 2 TVRS stations, a total lead time of 6 months is assumed. For 3 TVRS stations, an indicative lead time of 8 months applies. These data are subject to change and the actual lead time depends on various factors.
What information is being collected about the market and possible solutions?
Information is being collected regarding available products, services, technologies, and market practices. Additionally, insight is sought into the market structure, potential suppliers, competition, and capacity, as well as feedback on possible solutions, risks, and costs.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159