Tender for the supply of nine electric commercial vehicles and light trucks for the Municipality of Hilversum, divided into four lots.
Supplies · Open · European procedure
01What is being requested
Supply of nine battery-electric driven commercial vehicles divided into four lots, including interior, bodywork, and after-sales. The contract runs from December 2024 to November 2027 with the option for four extra vehicles.
The contracting authority intends to procure five battery-electric driven commercial vehicles (vans and light trucks) in the period 2024 – 2025 and four battery-electric driven vans in 2026. The contractor is responsible for the complete delivery of the commercial vehicles, including the interior and bodywork described in the PvE and after-sales. The contract is divided into four lots.
02Outcome
Stam Autobedrijven B.V.
03Strategic insight
Focus on a competitive total tender price as this determines 60% of the award. Ensure a strong substantiation of quality to achieve the remaining 40%. Take into account the specific requirements for battery-electric drive per lot.
04Points of attention
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
See the Tender Guidelines for a description of the qualitative award criteria
The total tender price, see the Tender Guidelines for the description
07Process & timeline
08Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
09Bidders in this segment
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What is the scope of the contract regarding the number of vehicles?
Which specific vehicle types are expected within the contract?
What requirements are imposed on after-sales and service?
What does the contractor's responsibility entail during delivery?
Automatically compiled from the official tender data and documents.