HbR Business Housing Eemhavenweg
Havenbedrijf Rotterdam (HbR) intends to redevelop its site at Eemhavenweg 10-14. The existing buildings will be split and reconfigured into two parts. The new construction must provide accommodation for various departments and training programs of the Havenmeester Division and the Asset Management department. A key objective is to achieve ambitious sustainability goals: reducing the CO2 emissions of its own corporate real estate and contributing to the energy transition. HbR strives for a building that meets Dutch climate goals, utilizing innovative energy solutions, circular building materials, and a high level of energy efficiency. The tender is conducted under a competitive procedure with negotiation, aimed at a construction contract with a strong focus on sustainability and future-proof infrastructure.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
Havenbedrijf Rotterdam (HbR) intends to redevelop its site at Eemhavenweg 10-14. The existing buildings will be split and reconfigured into two parts. The new construction must provide accommodation for various departments and training programs of the Havenmeester Division and the Asset Management department. A key objective is to achieve ambitious sustainability goals: reducing the CO2 emissions of its own corporate real estate and contributing to the energy transition. HbR strives for a building that meets Dutch climate goals, utilizing innovative energy solutions, circular building materials, and a high level of energy efficiency. The tender is conducted under a competitive procedure with negotiation, aimed at a construction contract with a strong focus on sustainability and future-proof infrastructure.
HbR is working on the redevelopment of its site at Eemhavenweg 10-14. The existing site will be split and reconfigured into two parts. The new construction has been assigned an ambitious sustainability goal, so that it contributes to HbR's climate goals to reduce the CO2 emissions of its own corporate real estate. As the developer of the port, HbR is committed to developing the port into the place where the energy transition takes shape. The Netherlands faces the challenge of making the economy and society almost CO2-neutral within 30 years. The new construction will serve as a home for variou
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the redevelopment of Eemhavenweg 10-14?
Which sustainability objectives are linked to this contract?
What role does the contract play in the energy transition?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159