Havenbedrijf Moerdijk N.V. wishes to have maintenance dredging works carried out in all inlet basins of the port complex. The contract concerns an open procedure for a works contract without a CPV code. The contractor must provide a suitable dredging platform (vessel, dredger, ballast), perform the works in accordance with port and environmental legislation, and maintain depth and water quality within the established tolerances. A clear schedule is required, including minimal interruptions to vessel traffic, and a reporting and monitoring plan for progress. The tender requires experience with similar port dredging projects, a valid permit package, and a safety and environmental management plan. The contracting authority expects transparent pricing, a clear delivery and completion schedule, and post-completion support for any corrections.
Works · Open · National procedure
01What is being requested
Havenbedrijf Moerdijk N.V. wishes to have maintenance dredging works carried out in all inlet basins of the port complex. The contract concerns an open procedure for a works contract without a CPV code. The contractor must provide a suitable dredging platform (vessel, dredger, ballast), perform the works in accordance with port and environmental legislation, and maintain depth and water quality within the established tolerances. A clear schedule is required, including minimal interruptions to vessel traffic, and a reporting and monitoring plan for progress. The tender requires experience with similar port dredging projects, a valid permit package, and a safety and environmental management plan. The contracting authority expects transparent pricing, a clear delivery and completion schedule, and post-completion support for any corrections.
Maintenance dredging works must be carried out in all inlet basins within Havenbedrijf Moerdijk. For this purpose, a tender for dredging works is being conducted.
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Tender documents
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific scope of the dredging works?
Which operational requirements must the execution meet?
What planning and reporting are expected?
What documentation is required for the execution?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln