Dredging works

Havenbedrijf Moerdijk N.V. · Open · 303004
Type
Works
45252124
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Havenbedrijf Moerdijk N.V. wishes to have maintenance dredging works carried out in all inlet basins of the port complex. The contract concerns an open procedure for a works contract without a CPV code. The contractor must provide a suitable dredging platform (vessel, dredger, ballast), perform the works in accordance with port and environmental legislation, and maintain depth and water quality within the established tolerances. A clear schedule is required, including minimal interruptions to vessel traffic, and a reporting and monitoring plan for progress. The tender requires experience with similar port dredging projects, a valid permit package, and a safety and environmental management plan. The contracting authority expects transparent pricing, a clear delivery and completion schedule, and post-completion support for any corrections.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksdredging worksportMoerdijk

01What is being requested

Havenbedrijf Moerdijk N.V. wishes to have maintenance dredging works carried out in all inlet basins of the port complex. The contract concerns an open procedure for a works contract without a CPV code. The contractor must provide a suitable dredging platform (vessel, dredger, ballast), perform the works in accordance with port and environmental legislation, and maintain depth and water quality within the established tolerances. A clear schedule is required, including minimal interruptions to vessel traffic, and a reporting and monitoring plan for progress. The tender requires experience with similar port dredging projects, a valid permit package, and a safety and environmental management plan. The contracting authority expects transparent pricing, a clear delivery and completion schedule, and post-completion support for any corrections.

Maintenance dredging works must be carried out in all inlet basins within Havenbedrijf Moerdijk. For this purpose, a tender for dredging works is being conducted.

45252124Works

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10070×
2KWS Infra B.V.SME10092×
3Van Oord Nederland BVSME10019×
4Ploegam B.V.SME10022×
5De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9926×
6Fa. Gebr. Van der LeeUnknown9724×

04Tender documents

Nota van inlichtingen 3 - BaggerwerkzaamhedenpdfSep 7, 2023 · 87 KB
Bijlage R.1 - 1510113RU-01 WBO Roode Vaart versie A (1)pdfSep 7, 2023 · 9711 KB
Bijlage I - Prijzenblad (Inschrijfstaat) beveiligd V1.2xlsxAug 11, 2023 · 26 KB
Bijlage S - PeilingenzipAug 11, 2023 · 81835 KB
Nota van inlichtingen 2 - BaggerwerkzaamhedenpdfAug 11, 2023 · 145 KB
Bijlage R - WBOzipAug 11, 2023 · 85103 KB
Beschrijvend document HbM Baggerwerkzaamheden V1.2pdfAug 11, 2023 · 481 KB
Nota van inlichtingen 1 - BaggerwerkzaamhedenpdfJul 26, 2023 · 162 KB
Bijlage O - Indicatieve hoeveelheden baggerwerk obv kwaliteitpdfJul 26, 2023 · 70 KB
Bijlage M - Scope en afbakening PoM baggerwerkzaamhedenpdfJul 26, 2023 · 159 KB
Bijlage N - Extra peilingenzipJul 26, 2023 · 28015 KB
Bijlage Q - Kades en steigers in beheer van PoMpdfJul 26, 2023 · 100 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific scope of the dredging works?
The contract concerns the execution of maintenance dredging works in all inlet basins within Havenbedrijf Moerdijk.
Which operational requirements must the execution meet?
The works must be carried out in accordance with port and environmental legislation, whereby the depth and water quality must remain within the established tolerances.
What planning and reporting are expected?
A clear schedule is required with minimal interruptions to vessel traffic, including a reporting and monitoring plan for progress.
What documentation is required for the execution?
The contractor must provide a safety and environmental management plan and must possess a valid permit package.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159