Regular dredging 2021A - sub-area 2 (DIG-15739/02)
This assignment concerns the dredging of waterways in various polders of the Hoogheemraadschap van Rijnland with a duration until March 2026. The award is based on an equal weighting between price and quality, in which emission-free working is central.
Works · Open · National procedure
01What is being requested
The dredging of waterways in urban and rural areas within the management area of HHR, including preparation, transport, processing of dredged material and additional works until 16 March 2026.
The assignment concerns the dredging of waterways in both urban and rural areas, spread across various polders, within the management area of HHR.
02Strategic insight
Focus strongly on the emission-free excavation and transport of dredged material to maximize the quality score. Ensure that all certificates such as ISO 9001, VCA** and CO2 awareness level 5 are provided immediately as evidence. Carefully check the specification table for the physical dispersibility of the material per location.
03Points of attention
04Can I take part?
05Award criteria
Assessment of K1 Emission-free dredging (excavation and transport per axle including plans of approach) and K2 Plan of Approach Environmental Management.
Tender form and Tender schedule.
06Process & timeline
07Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Bidders in this segment
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
What exactly does the assignment for dredging works entail?
Which specific tasks are part of the execution of this contract?
What are the most important deadlines for the delivery of the work?
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159