AwardedWorksEuropeanOpen

AWP2.0 - reconstruction Hoeven junction

Waterschap Brabantse Delta · Open · 1 lots · 273310
Type
Works
45231300
Estimated value
€ 4,10M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Brabantse Delta has launched an open tender for the reconstruction of the Hoeven junction, part of the AWP Hoeven pressure main. The contract will be awarded via a construction team agreement (bouwteamovereenkomst), in which a construction team manages the entire project cycle. The project is divided into two phases: a design phase (construction team phase) in which the design, planning, and technical specifications are established, and a realization phase in which the actual construction and installation take place. The construction team structure promotes collaboration between the contracting authority, architect, contractor, and other involved parties, leading to more efficient execution and better quality control. The tender is public, allowing all interested parties access to the tender documents. The CPV code is not specified, but the works fall under the category of works in the water and infrastructure sector.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€4,100,000
estimated value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Breda
CharacteristicsCPV 45WorksEU tenderreconstructionjunctionHoeven

01What is being requested

Waterschap Brabantse Delta has launched an open tender for the reconstruction of the Hoeven junction, part of the AWP Hoeven pressure main. The contract will be awarded via a construction team agreement (bouwteamovereenkomst), in which a construction team manages the entire project cycle. The project is divided into two phases: a design phase (construction team phase) in which the design, planning, and technical specifications are established, and a realization phase in which the actual construction and installation take place. The construction team structure promotes collaboration between the contracting authority, architect, contractor, and other involved parties, leading to more efficient execution and better quality control. The tender is public, allowing all interested parties access to the tender documents. The CPV code is not specified, but the works fall under the category of works in the water and infrastructure sector.

The assignment concerns works. The contract will be awarded in the form of a construction team agreement. Pursuant to the construction team collaboration, the contract for the reconstruction of the AWP Hoeven pressure main and related works (the Project) will be executed in 2 phases: the design phase (i.e., construction team phase) and the realization phase. Further information can be found in the tender guidelines, which are attached as an annex to this tender.

45231300€ 4,10MWorks
1Lot 1€4,100,000

02Outcome

Awarded

Van Boekel Bouw & Infra B.V.

Award value
€4,100,000
vs. estimate
0%

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€4,100,000

05Bidders in this segment

#Likely bidderFitWins
1Heijmans Infra B.V.SME9965×
2Boskalis Nederland B.V.SME9869×
3Dura Vermeer Infra Regionale Projecten BVSME9858×
4KWS Infra B.V.SME9792×
5Combinatie Heijmans - SWARCOUnknown9773×
6BAM Infra B.V.SME9677×

06Tender documents

TN378231 - SF03 Aankondiging van een gegunde opdracht 20230216093255pdfFeb 16, 2023 · 28 KB
TN378231 - SF02 Aankondiging van een opdracht 20220925110348pdfSep 25, 2022 · 29 KB

07Legal themes that may be relevant here

08Frequently asked questions

In what manner will the contract be executed?
The contract for the reconstruction of the AWP Hoeven pressure main and related works will be executed in the form of a construction team agreement.
Into which phases is the project divided?
Execution takes place in two phases: the design phase (construction team phase), in which the design, planning, and technical specifications are established, and the realization phase for the actual construction and installation.
What is the purpose of the chosen construction team structure?
The construction team structure is intended to promote collaboration between the contracting authority, architect, contractor, and other involved parties, leading to more efficient execution and better quality control.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,1 mln

Gegunde waarden in CPV 45 · werken n=3159