AT-2024-27: Water Framework Directive (WFD)
Rijkswaterstaat will publish various tenders for the implementation of measures within the Water Framework Directive for the end of 2027. The assignments include hydraulic works and civil engineering in various Dutch regions.
Works · Marktconsultatie · National procedure
01What is being requested
Execution of various WFD measures within the regions West-Netherlands South, Central-Netherlands, East-Netherlands and South-Netherlands, focused on civil engineering and hydraulic works.
Since 2000, the European Water Framework Directive (WFD) has been in force. The general objective of the WFD is to protect aquatic ecosystems and terrestrial ecosystems that depend on water from further deterioration and to improve the quality of these ecosystems. The Water Quality Improvement Programme for National Waterways aims to ensure that the design of the main water system meets the requirements of the Water Framework Directive (WFD). Rijkswaterstaat faces the task of having the WFD projects completed by the end of 2027 at the latest. From the WFD regions West-Netherlands South (WNZ),
02Strategic insight
Ensure sufficient zero-emission equipment and anticipate the high demand in the market. Take the planning and the availability of raw materials into account. Possibly strengthen the team with an ecologist for the ecological added value.
03Points of attention
04Can I take part?
05Award criteria
Rijkswaterstaat aims to apply the requirement of a minimum 30% deployment of zero-emission equipment.
Rijkswaterstaat aims to apply an MKI-W or zero-emission equipment as a BPKV criterion for all WFD projects.
Assessment based on price and Environmental Cost Indicator.
06Process & timeline
07Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Likely competitors
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
What is the purpose of the market consultation for the Water Framework Directive (WFD)?
Which regions do the planned WFD tenders focus on?
What is the intended realization period for the WFD projects?
Which specific themes will be addressed during the market consultation?
In which period are the WFD tenders expected?
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159