AI 2024-0113 Roof Renovation Stedelijk Museum Amsterdam
Integral renovation and sustainability improvement of approximately 4,500 m² of roof and roof structure of the Stedelijk Museum Amsterdam. The assignment includes building, structural, and installation engineering works in a national monument environment.
Works · Restricted · European procedure
01What is being requested
The assignment concerns the restoration, renovation and sustainability improvement of the roofs and roof structures of the old building of the Stedelijk Museum Amsterdam over approximately 4,500 m². The project includes integral building, structural, and installation engineering works within the constraints of a national monument.
The project concerns the restoration, renovation, and sustainability improvement of the roofs and roof structures of the old building of the Stedelijk Museum Amsterdam (approximately 4,500 m²). The reason for the project is structural leaks and overdue maintenance. These defects pose risks to both the museum collection and the continuity of the museum's operations. The assignment includes both the preparation and the execution of the roof renovation. It is an integral project in which building, structural, and installation engineering works are carried out in conjunction.
02Strategic insight
When submitting the qualitative bid, focus strongly on the Plan of Approach for the construction team phase. Ensure a transparent and traceable price structure within the context of the collaboration. Emphasize expertise in working within a national monument and the management of the construction team process.
03Points of attention
04Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
05Award criteria
Assessment based on a Plan of Approach (PvA) to be drawn up by the bidder, with attention to the organization of the construction team process, management, risk management, and the path towards an execution-ready and feasible plan within the frameworks of the Technical Design (TO).
To follow by guidance.
To follow by guidance.
06Process & timeline
07Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Likely competitors
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
Which disciplines are carried out within this integral project?
To which specific conditions must the execution comply?
What are the most important works included in the assignment?
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159