ClosedWorksRestrictedGreen

AI 2023‐0514 - Trailer Parking

Gemeente Amsterdam · Restricted · 1 lots · 323520
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Amsterdam has issued a tender for the realization of a temporary trailer parking area at the intersection of Holterbergweg/Burgemeester Stramanweg, near ArenaPoort. The location must accommodate trailers for events in the Ziggo Dome and other concert halls 20 times per year, for three days each time. Because the parking area remains largely empty, the design must be a high-quality ‘Green Waiting Room’ that contributes to the local ecology. The construction includes a driven sheet pile wall, high-quality fencing, compact slender trees, and grass concrete paving. The surroundings include a watercourse, a bus lane and stop, and a 150 kV high-voltage line, requiring consideration for drainage, traffic safety, and electrical infrastructure. The project falls under a non-public procedure and focuses on works. The contracting authority expects an integrated approach that combines construction, landscape architecture, and environmental management, with attention to sustainability, safety, and aesthetics.

Works · Restricted · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPtrailer parkinggreen waiting roomArenaPoort

01What is being requested

The Municipality of Amsterdam has issued a tender for the realization of a temporary trailer parking area at the intersection of Holterbergweg/Burgemeester Stramanweg, near ArenaPoort. The location must accommodate trailers for events in the Ziggo Dome and other concert halls 20 times per year, for three days each time. Because the parking area remains largely empty, the design must be a high-quality ‘Green Waiting Room’ that contributes to the local ecology. The construction includes a driven sheet pile wall, high-quality fencing, compact slender trees, and grass concrete paving. The surroundings include a watercourse, a bus lane and stop, and a 150 kV high-voltage line, requiring consideration for drainage, traffic safety, and electrical infrastructure. The project falls under a non-public procedure and focuses on works. The contracting authority expects an integrated approach that combines construction, landscape architecture, and environmental management, with attention to sustainability, safety, and aesthetics.

ArenaPoort is the area where all of the Netherlands comes to celebrate. The Ziggo Dome and other concert halls provide a stage for international artists. Large trailers, enormous trucks with trailers transport the components of international artists' shows across Europe. Currently, P12 is the trailer parking area, which will be redeveloped in the near future. Therefore, following a location study, a trailer parking area has been chosen at the intersection of Holterbergweg and Burgemeester Stramanweg. This allows trailers to park at or depart for the next event at the event halls within minutes

45000000Works
1AI 2023‐0514 - Trailer Parking€0

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Reimert Bouw en Infrastructuur B.V.SME9817×
2Dura Vermeer Infra Regionale Projecten BVSME9458×
3Boskalis Nederland B.V.SME9269×
4Van Gelder BVSME9253×
5KWS Infra B.V.SME9192×
6BAM Infra B.V.SME9177×

04Legal themes that may be relevant here

05Frequently asked questions

What is the intended function and use of the trailer parking area?
The location serves for the parking of large trailers and trucks that transport the shows of international artists in the Ziggo Dome and other concert halls. The use is not permanent; the parking area is used approximately 20 times per year for three days.
What aesthetic and ecological requirements are imposed on the design?
The parking area must be designed as a high-quality ‘Green Waiting Room’ that contributes to the local ecology. The design includes a sustainable, striking design with a driven sheet pile wall, high-quality fencing, compact slender trees, and grass concrete paving.
Which infrastructural factors must be taken into account during realization?
During realization, account must be taken of the presence of a watercourse (important for the drainage of the polder), a bus lane and stop that is being relocated, and a 150 kV high-voltage line.
Which sustainability criteria apply to this assignment?
Sustainability criteria apply to this assignment, whereby the parking area must contribute to the local ecology through a green design.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159