ClosedWorksEuropeanOpenGreen

AI 2023-0512 Renovation and sustainability of catering and office Jaap Eden complex construction team phase

Gemeente Amsterdam · Open · 1 lots · 332364
Type
Works
45000000
Estimated value
€ 5,50M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Amsterdam wishes to modernize the outdated Jaap Eden ice complex. The assignment is phased: in phase 1, the 400m track will be replaced and the krabbelbaan will be relocated, including a new technical building; this will take place in the summer of 2023 and at the end of 2024. Phase 2 focuses on the buildings: the ice rink must be replaced, and the office and catering buildings will undergo large-scale renovation, being made gas-free and sustainable. The contracting authority is seeking a construction team agreement; if successful, a works contract will follow. The tender requires continuity of business operations, energy efficiency, gas-free operations, and a phased planning approach.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€5,500,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPconstruction teamrenovationsustainability

01What is being requested

The Municipality of Amsterdam wishes to modernize the outdated Jaap Eden ice complex. The assignment is phased: in phase 1, the 400m track will be replaced and the krabbelbaan will be relocated, including a new technical building; this will take place in the summer of 2023 and at the end of 2024. Phase 2 focuses on the buildings: the ice rink must be replaced, and the office and catering buildings will undergo large-scale renovation, being made gas-free and sustainable. The contracting authority is seeking a construction team agreement; if successful, a works contract will follow. The tender requires continuity of business operations, energy efficiency, gas-free operations, and a phased planning approach.

The Jaap Edenbaan ice complex is so outdated that replacement and renovation are necessary. To limit the impact on business operations and to ensure that ice can always be guaranteed, a phased execution is necessary. Phase 1 concerns the replacement of the 400m track and the relocation of the krabbelbaan and a new technical building. To continue to guarantee the business operations of the 400m track, the replacement of the 400m track and the relocation of the krabbelbaan were already carried out in the summer period of 2023. From March 2024, at the end of the skating season, the technical equi

45000000€ 5,50MWorks
1AI 2023-0512 Renovation and sustainability of catering and office Jaap Eden complex construction team phase€5,500,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€5,500,000

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9958×
2Heijmans Infra B.V.SME9865×
3KWS Infra B.V.SME9792×
4BAM Infra B.V.SME9777×
5Heijmans Utiliteit B.V.SME9727×
6Boskalis Nederland B.V.SME9769×

05Legal themes that may be relevant here

06Frequently asked questions

What is the intended contract form for this project?
The contracting authority wishes to enter into a Construction Team Agreement with the Construction Team Partner. If the construction team phase leads to the desired result, a Works Contract will be concluded with the Construction Team Partner.
What are the main components of phase 2 of the renovation?
Phase 2 focuses on the buildings. The ice rink must be replaced and the existing buildings, such as the office building and the catering building, must be extensively renovated, made gas-free, and made sustainable.
Why was a phased execution of the works chosen?
A phased execution is necessary to limit the impact on business operations and to guarantee that ice remains available at all times.
What is the content of phase 1 of the works?
Phase 1 concerns the replacement of the 400m track and the relocation of the krabbelbaan and a new technical building. In March 2024, the technical equipment will be moved from the existing space to the new building.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 5,5 mln

Gegunde waarden in CPV 45 · werken n=3159