ClosedSuppliesEuropeanOnderhandeling zonder bekendmaking

Extraction system for hotelschool

Stichting voor Educatie en Beroepsonderwijs · Onderhandeling zonder bekendmaking · 1 lots · 370880
Type
Supplies
39714110
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Negotiated procedure without publication: Extraction system for hotelschool. The tender is closed, without a deadline or a specified value for the project being provided. CPV 39714110. The assessment tasks, documents, and contact details are not included in the available data.

Supplies · Onderhandeling zonder bekendmaking · European procedure

European
Contract type
Supplies
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 39SuppliesEU tender

01What is being requested

Negotiated procedure without publication: Extraction system for hotelschool. The tender is closed, without a deadline or a specified value for the project being provided. CPV 39714110. The assessment tasks, documents, and contact details are not included in the available data.

This concerns a control platform with demand-driven ventilation as a key function. The control system adjusts the airflow in the kitchen in real time, depending on the status of the cooking equipment and usage. This results in significant energy savings at all levels of the kitchen ventilation.

39714110Supplies
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Heutink Primair Onderwijs B.V.SME94149×
2Eromesmarko B.V.SME94105×
3Gispen Nederland BVSME9492×
4Presikhaaf Schoolmeubelen B.V.SME9151×
5Reinders OisterwijkUnknown8529×
6B. Schilte en Zonen's Houthandel en Houtwarenfabriek B.V.SME8421×

05Legal themes that may be relevant here

06Frequently asked questions

What does the contract for the extraction system entail?
The contract includes the delivery, installation, connection, commissioning, and maintenance of a demand-driven ventilation system for various kitchens, consisting of a total of 17 extraction hoods.
What is the function of the control platform?
The control platform includes demand-driven ventilation that adjusts the airflow in the kitchen in real time based on the status of the cooking equipment and usage, leading to energy savings at all levels of the kitchen ventilation.
What is the duration of the maintenance?
The maintenance of the delivered demand-driven ventilation system will be carried out for a period of five years.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 196K
median
€ 480K
p75
€ 1,5 mln
deze opdracht

Gegunde waarden in CPV 39 · leveringen n=792