Procurement of Power Quality Measuring System
Netbeheer Nederland is conducting a market consultation for the procurement of a new power quality measuring system for the PQM project. The goal is to collect information regarding hardware, software, and services to prepare for the future tender.
Supplies · Marktconsultatie · National procedure
01What is being requested
The assignment concerns the preparation of a tender for the procurement of a PQ measuring system, consisting of PQ meters, communication means, database environment, and analysis software for the PQM project.
In the Netherlands, the government sets requirements for electricity grids. Part of these requirements is that grid operators monitor the voltage quality in their grids at the customer connection using a measurement program. This is a legal obligation enshrined in the Elektriciteitswet 1998. The present market consultation relates to the preparation of the procurement process for a new power quality measuring system.
02Strategic insight
When responding, focus on the technical specifications of the PQ meter and the scalability of the software. Provide explicit advice regarding communication methodologies for LV and MV customers. If possible, also offer services for installation and management to maximize the relief for the grid operators.
03Points of attention
04Can I take part?
05Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
06Likely competitors
07Tender documents
08Legal themes that may be relevant here
09Frequently asked questions
What is the purpose of this market consultation?
Which technical aspects are being investigated during the market consultation?
In what way is the power supply of the PQ meter being investigated?
Automatically compiled from the official tender data and documents.
10Estimated value versus the market
€ 300K
€ 515K
€ 1,7 mln
Gegunde waarden in CPV 38 · leveringen n=331