ClosedSuppliesMarktconsultatie

Procurement of Power Quality Measuring System

Netbeheer Nederland · Marktconsultatie · 1 lots · 362431
Type
Supplies
38341300
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Netbeheer Nederland is conducting a market consultation for the procurement of a new power quality measuring system for the PQM project. The goal is to collect information regarding hardware, software, and services to prepare for the future tender.

Supplies · Marktconsultatie · National procedure

Contracting authority
Contract type
Supplies
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 38Suppliespower qualitymeasuring systemNetbeheer Nederland

01What is being requested

The assignment concerns the preparation of a tender for the procurement of a PQ measuring system, consisting of PQ meters, communication means, database environment, and analysis software for the PQM project.

In the Netherlands, the government sets requirements for electricity grids. Part of these requirements is that grid operators monitor the voltage quality in their grids at the customer connection using a measurement program. This is a legal obligation enshrined in the Elektriciteitswet 1998. The present market consultation relates to the preparation of the procurement process for a new power quality measuring system.

38341300Supplies
1Procurement of Power Quality Measuring System

02Strategic insight

Strategic insight · AI analysis
When responding, focus on the technical specifications of the PQ meter and the scalability of the software. Provide explicit advice regarding communication methodologies for LV and MV customers. If possible, also offer services for installation and management to maximize the relief for the grid operators.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The market consultation is not a tender.Important
All communication must take place exclusively via TenderNed.Important
Direct contact with grid operators is not permitted.Important
Participation in the consultation provides no right to a contract.Important

04Can I take part?

Technical · 5
The measuring system measures according to the Netcode elektriciteit and can report on the measurement results in accordance with the voltage quality criteria set therein.Technical
The PQ meter is Class A certified according to IEC 61000-4-30: 2015.Technical
The PQ meter possesses sufficient memory to store at least six months of measurement data.Technical
The PQ meter can be read out remotely and continuously in a secure manner.Technical
The measuring system supports the protocols from the IEC 61850 with the data formats COMTRADE and PQDIF.Technical

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

06Likely competitors

#Likely bidderFitWins
1Afas Software B.V.SME7311×
2PQR B.V.SME57
3IP Parking B.V.SME56
4PinkRoccade Local Government B.V.SME55
5NotuBiz Nederland b.v.SME55
6Kamstrup B.V.SME54

07Tender documents

TN504022 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20241223102352pdfDec 23, 2024 · 5 KB
Vragen marktconsultatie PQ-metersdocxDec 23, 2024 · 27 KB
Marktconsultatiedocument PQ-meterspdfDec 23, 2024 · 252 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the purpose of this market consultation?
The market consultation serves as preparation for the procurement process for the acquisition of a new power quality measuring system.
Which technical aspects are being investigated during the market consultation?
Questions are asked regarding the scalability of the database and reporting environment, the expected lifespan, the possibility of simultaneous phase-phase (LL) and phase-neutral (LN) measurements, and the usability as a PMU (Phase Measurement Unit).
In what way is the power supply of the PQ meter being investigated?
It is asked whether the PQ meter is powered via the voltage measurement circuit or via an external power supply.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 300K
median
€ 515K
p75
€ 1,7 mln
deze opdracht

Gegunde waarden in CPV 38 · leveringen n=331