Procurement of Wastewater Treatment Plant
• Tender: supply and installation of 2 autonomously operating membrane bioreactors, integrated into one ISO container, for use at a military camp. • Installation location: Aruba (local university). The purpose is research under warm climatic conditions. • Expected execution: after research, the results will be made available. • Conditions: open, award procedure, CPV 42996000, status closed, deadline 19-09-2024 12:00 CET. • Value: unknown.
Supplies · Open · European procedure
01What is being requested
• Tender: supply and installation of 2 autonomously operating membrane bioreactors, integrated into one ISO container, for use at a military camp. • Installation location: Aruba (local university). The purpose is research under warm climatic conditions. • Expected execution: after research, the results will be made available. • Conditions: open, award procedure, CPV 42996000, status closed, deadline 19-09-2024 12:00 CET. • Value: unknown.
The contracting authority hereby invites you to submit a tender for the procurement of the supply of a Wastewater Treatment Plant. The installation must consist of two (2) autonomously operating membrane bioreactors built into one (1) insulated ISO container, suitable for use at a military camp. The installation is being purchased to conduct research into the functioning of the respective plant under warm climatic conditions. For this purpose, the installation will be placed at a local university in Aruba, where students from the university will conduct the research. Following the research per
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific technical description of the requested installation?
What is the purpose of the procurement of this wastewater treatment plant?
For what type of use is the installation intended?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 300K
€ 800K
€ 4,0 mln
Gegunde waarden in CPV 42 · leveringen n=273