Contractor/Installer construction team Baeks Kompas
This project concerns the realization of the Kindcentrum Plus Baeks Kompas in Beek with strict requirements regarding sustainability, energy neutrality, and circularity.
Works · Open · European procedure
01What is being requested
Realization of the Kindcentrum Plus Baeks Kompas in Beek, in which the technical principles and ambitions for the design and execution are established.
The objective of the tender is to enter into two construction team agreements with one party per agreement based on the most economically advantageous tender for participation in the construction team of the Kindcentrum Plus to be realized. The aim of this tender is the realization of a Kindcentrum Plus, i.e., a primary school, childcare, a library, and a support center for the regional GGD youth healthcare, supplemented with other child-oriented facilities and spaces for music education, speech therapy, and similar, with associated outdoor spaces and a kiss and ride zone.
02Outcome
Pellikaan Bouwbedrijf B.V.
03Strategic insight
Ensure full coverage of the required insurance amounts in accordance with the specific requirements per lot. Carefully align the design with the sustainability ambitions such as the GPR score and the ENG requirement. Take into account the desired grid dimension of 1.80 m for the flexibility of the building.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
08Bidders in this segment
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
What is the objective of the construction team agreements for the KC Baeks Kompas project?
In what manner does the preparation of the project take place?
Which specific works fall under the agreement for the installer?
Which model is used for the construction team agreements?
Automatically compiled from the official tender data and documents.