Dredging works quays 5420 to 5480
Havenbedrijf Gent nv has a competitive procedure with negotiation for the dredging works at quays 5420 to 5480 at the new all weather terminal of ArcelorMittal Gent. The terminal must be operational in 2020, which requires the dredging works to be carried out both at the berth level and in the approach channels. The contract focuses on the dredging, processing, and disposal of the dredged material, whereby the contractor must provide their own processing and/or disposal location. The works require a combination of maritime engineering, earthmoving, and logistics, with attention to environmentally friendly processing and storage of the dredged material. The tender calls for an experienced contractor capable of meeting the technical, safety, and environmental requirements, and who can respond flexibly during the negotiation phase.
Works · Competitive procedure with negotiation · National procedure
01What is being requested
Havenbedrijf Gent nv has a competitive procedure with negotiation for the dredging works at quays 5420 to 5480 at the new all weather terminal of ArcelorMittal Gent. The terminal must be operational in 2020, which requires the dredging works to be carried out both at the berth level and in the approach channels. The contract focuses on the dredging, processing, and disposal of the dredged material, whereby the contractor must provide their own processing and/or disposal location. The works require a combination of maritime engineering, earthmoving, and logistics, with attention to environmentally friendly processing and storage of the dredged material. The tender calls for an experienced contractor capable of meeting the technical, safety, and environmental requirements, and who can respond flexibly during the negotiation phase.
A new all weather terminal is being built at ArcelorMittal Gent. This will be operational in 2020. For this purpose, the necessary dredging works must be carried out, both at the berth level and in the approach channels (quay 5420 to 5480). The current contract mainly includes the dredging and processing/disposal of the dredged material, whereby the contractor provides their own processing and/or disposal location.
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Tender documents
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific scope of the dredging works?
What is expected regarding the processing of the dredged material?
What is the intended use of the location?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159